- All Countries
- Thailand
- Indonesia
- Malaysia
- Singapore
- India
- Myanmar
- Vietnam
- Japan
- All Buildings
- Commercial / Offices
- Interior Fit-Out
- Industrial
- Hospitality
- Education / Research
- Airports
- Others
![Archetype Thailand](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/ae93d60362e215013e98b8fe72d38368_f8869.jpg?width=1903&height=1080&name=ae93d60362e215013e98b8fe72d38368_f8869.jpg)
Thailand
Continental Tires Thailand New Plant
![e2e6e0872fc54c6bd5dfa149310de1b8_f6345](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/e2e6e0872fc54c6bd5dfa149310de1b8_f6345.jpg?width=1061&height=1080&name=e2e6e0872fc54c6bd5dfa149310de1b8_f6345.jpg)
Singapore
Changi International Airport Terminal 1 West Lounge
![Changi International Airport Terminal](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/be76648ecdda6e75e4b891af5c82af81_f6342.jpg?width=1620&height=1080&name=be76648ecdda6e75e4b891af5c82af81_f6342.jpg)
Singapore
Changi International Airport Terminal 1 Fixed Gangways
![IKEA DISTRIBUTION CENTRE PORT KLANG](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/0e6a6c4cd55a3803ac39da18b01fab0c_f4592.jpg?width=900&height=572&name=0e6a6c4cd55a3803ac39da18b01fab0c_f4592.jpg)
Malaysia
IKEA DISTRIBUTION CENTRE PORT KLANG
![27c651b0f1825bd50311888412d1beaa_f3337](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/27c651b0f1825bd50311888412d1beaa_f3337.jpg?width=1621&height=1080&name=27c651b0f1825bd50311888412d1beaa_f3337.jpg)
Vietnam
NAKASHIMA VIETNAM Factory (Phase 2)
![c502ff16f56d682936f8235d0ae4d952_f3259](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/c502ff16f56d682936f8235d0ae4d952_f3259.jpg?width=1617&height=1080&name=c502ff16f56d682936f8235d0ae4d952_f3259.jpg)
Myanmar
TOYO INK MYANMAR THILAWA Factory
![96fe7d6426a8787fe6c890fa4a0c0c11_f1788](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/96fe7d6426a8787fe6c890fa4a0c0c11_f1788.jpg?width=289&height=200&name=96fe7d6426a8787fe6c890fa4a0c0c11_f1788.jpg)
Singapore
CAPITAGREEN
![5d31ab223d47e69e53612018ccf3f0b7_f1635](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/5d31ab223d47e69e53612018ccf3f0b7_f1635.jpg?width=1378&height=550&name=5d31ab223d47e69e53612018ccf3f0b7_f1635.jpg)
Singapore
Office HQ Building 2
![24316a627547587f0a2dc3ed199b4eae_f1634](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/24316a627547587f0a2dc3ed199b4eae_f1634.jpg?width=900&height=550&name=24316a627547587f0a2dc3ed199b4eae_f1634.jpg)
Singapore
CHANGI INTERNATIONAL AIRPORT Terminal 1 Upgrading 2
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/788519a150669b0e470a702d5998e8fb_f1504.jpg?width=316&height=203&name=788519a150669b0e470a702d5998e8fb_f1504.jpg)
Singapore
SHOWA DENKO HD Singapore Factory
![77c54c58def83dfe1baedeeccf5c2030_f1503](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/77c54c58def83dfe1baedeeccf5c2030_f1503.jpg?width=1000&height=666&name=77c54c58def83dfe1baedeeccf5c2030_f1503.jpg)
Singapore
THE SINGAPORE FLYER
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/8ddf9306a9dee983878c93e44b2334e5_f1636.jpg?width=1378&height=550&name=8ddf9306a9dee983878c93e44b2334e5_f1636.jpg)
Singapore
CAPITAGREEN
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/c2e88bf5d5c7ccab2e9ff9719993cf70_f1480.jpg?width=900&height=600&name=c2e88bf5d5c7ccab2e9ff9719993cf70_f1480.jpg)
Singapore
Office HQ Building
![03d8cd4bdfc004cda37ea351c28e4b57_f1471](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03d8cd4bdfc004cda37ea351c28e4b57_f1471.jpg?width=900&height=597&name=03d8cd4bdfc004cda37ea351c28e4b57_f1471.jpg)
Singapore
EDWARDS LIFESCIENCES Plant Phase 2
![a4b4587f7c4ec1daef9b9962c88d86e7_f1470](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/a4b4587f7c4ec1daef9b9962c88d86e7_f1470.jpg?width=900&height=600&name=a4b4587f7c4ec1daef9b9962c88d86e7_f1470.jpg)
Singapore
A&A Works to HOKKAIDO MARCHE
![Continental Tires Thailand New Plant](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/24c549b06cc717870252936f8ce2bb9f_f1467.jpg?width=900&height=675&name=24c549b06cc717870252936f8ce2bb9f_f1467.jpg)
Singapore
SELETAR AIRPORT
![5573287f59642eb4bfce00c76d21608e_f1457](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/5573287f59642eb4bfce00c76d21608e_f1457.jpg?width=900&height=398&name=5573287f59642eb4bfce00c76d21608e_f1457.jpg)
Singapore
CHANGI INTERNATIONAL AIRPORT Terminal 4
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/6badb17325e36642cf2bf3545b2f1d9f_f1447.jpg?width=824&height=509&name=6badb17325e36642cf2bf3545b2f1d9f_f1447.jpg)
Malaysia
CANON MACHINERY Factory Extension
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/65cd10f73be4d36afebe461cf53be43d_f1428.jpg?width=824&height=549&name=65cd10f73be4d36afebe461cf53be43d_f1428.jpg)
Malaysia
SMM/SMS New Factory
![2776a5604425cc6f674af231daee980c_f1426](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/2776a5604425cc6f674af231daee980c_f1426.jpg?width=824&height=549&name=2776a5604425cc6f674af231daee980c_f1426.jpg)
Malaysia
HIROSE Factory Extension
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/97f389604ee086fbaa0701610f5fdcab_f1369.jpg?width=900&height=505&name=97f389604ee086fbaa0701610f5fdcab_f1369.jpg)
Thailand
PEPSICO Thai New Factory 1
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/6618ff34e7ec7a190a3914346d0a5e4f_f1361-1.jpg?width=900&height=600&name=6618ff34e7ec7a190a3914346d0a5e4f_f1361-1.jpg)
Thailand
HOWA New Factory 2
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/5d487b1ac1113f074901c1535617dd4d_f1353.jpg?width=900&height=600&name=5d487b1ac1113f074901c1535617dd4d_f1353.jpg)
Thailand
IM ELECTRONICS Bangpoo Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/b749c4c92ea66ef268efaf4495a4180d_f1345.jpg?width=900&height=600&name=b749c4c92ea66ef268efaf4495a4180d_f1345.jpg)
Thailand
DIT New Research & Development Center
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/80cb8891f6f41f7c03f92d3f5cecfebe_f1340.jpg?width=900&height=600&name=80cb8891f6f41f7c03f92d3f5cecfebe_f1340.jpg)
Thailand
DAIWA KASEI (THAILAND) CO., LTD. Prachinburi Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/0505107e98d3ca5d468e0332a48fbd3f_f1339.jpg?width=900&height=600&name=0505107e98d3ca5d468e0332a48fbd3f_f1339.jpg)
Thailand
DMG MORI Amata Nakorn T.C. Project
![83fb65d96a6f8795b9e1f27ee0bc86b6_f1576](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/83fb65d96a6f8795b9e1f27ee0bc86b6_f1576.jpg?width=900&height=599&name=83fb65d96a6f8795b9e1f27ee0bc86b6_f1576.jpg)
India
KOKOKU Factory Phase 2
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02c20c20e59eb8005ab76bfcc0c74076_f1565.jpg?width=900&height=600&name=02c20c20e59eb8005ab76bfcc0c74076_f1565.jpg)
India
NEDO Office Interior
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/6215c49021824a6568e00c8895955fba_f1316.jpg?width=900&height=522&name=6215c49021824a6568e00c8895955fba_f1316.jpg)
India
FUTABA New Factory
![Continental Tires Thailand New Plant](https://takenaka.asia/hs-fs/hubfs/Continental%20Tires%20Thailand%20New%20Plant.jpg?width=355&height=237&name=Continental%20Tires%20Thailand%20New%20Plant.jpg)
India
YKK INDIA Factory Extension
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/281672466a70fdf3331ec7fff1d6a159_f1309.jpg?width=900&height=593&name=281672466a70fdf3331ec7fff1d6a159_f1309.jpg)
India
INDIA JAPAN LIGHTING Phase-2 Factory
![725e59316dfa326065a88658d5a788a7_f1575](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/725e59316dfa326065a88658d5a788a7_f1575.jpg?width=900&height=546&name=725e59316dfa326065a88658d5a788a7_f1575.jpg)
India
DAIPL Phase 2 Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/c5ac08cff27354cca6fd086c927060b0_f1301.jpg?width=900&height=600&name=c5ac08cff27354cca6fd086c927060b0_f1301.jpg)
India
FCC New Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/f6b27b10469167347c82cd55a618343c_f1294.jpg?width=900&height=459&name=f6b27b10469167347c82cd55a618343c_f1294.jpg)
India
TOYO INK Factory Extension
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03094d621faf274340c8e79f3df22035_f1574.jpg?width=900&height=600&name=03094d621faf274340c8e79f3df22035_f1574.jpg)
India
TMEIC-PE INDIA Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/1d44084bbd605618e0b3d6a52e7d5bcd_f1564.jpg?width=1920&height=994&name=1d44084bbd605618e0b3d6a52e7d5bcd_f1564.jpg)
India
MITSUBISHI ELEVATOR New Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/abbf61041413f887ea3a0621dfb76f27_f1573.jpg?width=900&height=511&name=abbf61041413f887ea3a0621dfb76f27_f1573.jpg)
India
DAIKIN R&D Center
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/1de61b6e7d220f995e07187ac96b0be6_f1273.jpg?width=900&height=594&name=1de61b6e7d220f995e07187ac96b0be6_f1273.jpg)
India
MUFG BANK NEW DELHI Branch Interior
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/a415e62720c59fd85464d19100bea2fb_f1563.jpg?width=900&height=441&name=a415e62720c59fd85464d19100bea2fb_f1563.jpg)
India
TMEIC RM New Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/b1a8220d515e2ca389282d4496f72789_f1572.jpg?width=900&height=586&name=b1a8220d515e2ca389282d4496f72789_f1572.jpg)
India
IMAX INDIA NEW FACTORY
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/6ff9bc518da0e05596487427d42e5584_f1571.jpg?width=900&height=600&name=6ff9bc518da0e05596487427d42e5584_f1571.jpg)
India
AJINOMOTO New Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/e75fd832da9e0b06d91cd2f2e3cfb5da_f1570.jpg?width=900&height=600&name=e75fd832da9e0b06d91cd2f2e3cfb5da_f1570.jpg)
India
MITSUI KINOKU COMPONENTS INDIA Factory (Phase 2)
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/44de4636602edbaa28888e43e7c9a679_f1569.jpg?width=900&height=601&name=44de4636602edbaa28888e43e7c9a679_f1569.jpg)
India
MI ELECTRICAL STEEL PROCESSING INDIA Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/c2ecba49ac9ec4526598a848f557ae05_f1568.jpg?width=900&height=600&name=c2ecba49ac9ec4526598a848f557ae05_f1568.jpg)
India
OJI JK PACKAGING INDIA Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/943e6498fa9da58729083329833ecb51_f1225.jpg?width=1200&height=800&name=943e6498fa9da58729083329833ecb51_f1225.jpg)
India
AMADA INDIA Technical Center
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/9156c84e24b9615d70203c228cd8319d_f1562.jpg?width=900&height=439&name=9156c84e24b9615d70203c228cd8319d_f1562.jpg)
India
TS-TECH INDIA New Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/7b1fa6aa0c3866a4392623d6b21ef7b1_f1210.jpg?width=900&height=600&name=7b1fa6aa0c3866a4392623d6b21ef7b1_f1210.jpg)
India
AMAGASAKI PIPE INDIA Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/eaf8f23954c2f4c0211b0739b9ba0674_f1205.jpg?width=900&height=600&name=eaf8f23954c2f4c0211b0739b9ba0674_f1205.jpg)
India
SANJO MACHINE WORKS INDIA Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/1754589e64869b98de706ad5640b87e0_f1566.jpg?width=1620&height=1080&name=1754589e64869b98de706ad5640b87e0_f1566.jpg)
India
OILES CORPORATION INDIA Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/c6793640a44ea2f482ee3b3a5236bf82_f1567.jpg?width=900&height=525&name=c6793640a44ea2f482ee3b3a5236bf82_f1567.jpg)
India
DENSO Technical Center
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/0425dda96d17435d878377d3b7905205_f999.jpg?width=900&height=600&name=0425dda96d17435d878377d3b7905205_f999.jpg)
Indonesia
MITSUI SOKO New Warehouse
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/99534b26bc91a1c929a453a3cf9887da_f991.jpg?width=900&height=600&name=99534b26bc91a1c929a453a3cf9887da_f991.jpg)
Indonesia
MMKI New Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/62bf62b6eb2b97b59f8a54e80c9a2c24_f986.jpg?width=900&height=600&name=62bf62b6eb2b97b59f8a54e80c9a2c24_f986.jpg)
Indonesia
MLI New Warehouse
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/a4fff289a07ccf11c138dd790c597c6e_f981.jpg?width=900&height=600&name=a4fff289a07ccf11c138dd790c597c6e_f981.jpg)
Indonesia
ECI New Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/3a24965815a682836333e9e8bb32cad2_f971.jpg?width=900&height=600&name=3a24965815a682836333e9e8bb32cad2_f971.jpg)
Indonesia
Cikarang Hotel Residences Phase 2
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01297601214b4cf8ecd88b867ad62276_f966.jpg?width=900&height=600&name=01297601214b4cf8ecd88b867ad62276_f966.jpg)
Indonesia
CERES GARUDA Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/d8fd3d2168d6122a1fbc81c195a20906_f961.jpg?width=900&height=600&name=d8fd3d2168d6122a1fbc81c195a20906_f961.jpg)
Indonesia
BSIN-K New Headquarters
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/18e56446e9ef7d7ed19c7bc2d89ade55_f956.jpg?width=900&height=600&name=18e56446e9ef7d7ed19c7bc2d89ade55_f956.jpg)
Indonesia
AEON Mall JGC Project
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/e9a20546ddb709edfd0c95e66c130805_f479.jpg?width=380&height=246&name=e9a20546ddb709edfd0c95e66c130805_f479.jpg)
Myanmar
BTMU YANGON Branch
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/c2c8c9ae57eafedd5d57d49ce1a117f1_f413.jpg?width=900&height=600&name=c2c8c9ae57eafedd5d57d49ce1a117f1_f413.jpg)
Thailand
ST 3rd Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/bb8097b41252375c3f5203bfdec531cc_f269.jpg?width=900&height=599&name=bb8097b41252375c3f5203bfdec531cc_f269.jpg)
Malaysia
KAYAKU SAFETY SYSTEMS Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/51cc6d5cf7364bb6d55530dd90c5ba1b_f265.jpg?width=900&height=599&name=51cc6d5cf7364bb6d55530dd90c5ba1b_f265.jpg)
Malaysia
AEON BIG Ipoh Falim
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/8084421598f26f833355f83a48d24be2_f260.jpg?width=900&height=599&name=8084421598f26f833355f83a48d24be2_f260.jpg)
Malaysia
AEON BIG Alor Setar
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/1c40a2255203ee324e8a0e0f46f85faa_f256.jpg?width=900&height=600&name=1c40a2255203ee324e8a0e0f46f85faa_f256.jpg)
Malaysia
PANASONIC ENERGY Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/1c70911417dcb0119fa59e837361a1ae_f253.jpg?width=900&height=601&name=1c70911417dcb0119fa59e837361a1ae_f253.jpg)
Indonesia
YKK ZIPCO DELTAMAS
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/b1be0cc9fe3d8e959c3aacdb8adf3f1e_f247.jpg?width=900&height=600&name=b1be0cc9fe3d8e959c3aacdb8adf3f1e_f247.jpg)
Indonesia
YAKULT INDONESIA
![ff4a26320acd645fb1bb9f58edacee74_f241](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/ff4a26320acd645fb1bb9f58edacee74_f241.jpg?width=900&height=600&name=ff4a26320acd645fb1bb9f58edacee74_f241.jpg)
Indonesia
ROCKPAINT
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/f1bda62d7d33334959401c0c69bc0585_f235.jpg?width=900&height=600&name=f1bda62d7d33334959401c0c69bc0585_f235.jpg)
Indonesia
LOTTE
![f5763cf6cd453e10e373df0c5498025d_f222](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/f5763cf6cd453e10e373df0c5498025d_f222.jpg?width=900&height=600&name=f5763cf6cd453e10e373df0c5498025d_f222.jpg)
Indonesia
HPM
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/d2b8963e0fdc0b166e65e42ff287f5ad_f217.jpg?width=900&height=600&name=d2b8963e0fdc0b166e65e42ff287f5ad_f217.jpg)
Indonesia
HANWA (HSSI)
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/a35d1b5ccf31b4a8fffba73588f7ef1d_f205.jpg?width=900&height=600&name=a35d1b5ccf31b4a8fffba73588f7ef1d_f205.jpg)
Indonesia
Cikarang Hotel Residences
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/0a1870ff4d054fabf51980fe840d37a5_f234.jpg?width=900&height=603&name=0a1870ff4d054fabf51980fe840d37a5_f234.jpg)
Indonesia
KUMON INSTITUTE OF EDUCATION (INDONESIA) Office
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/6dd287a92a7634f995bd8fa26c99da16_f214.jpg?width=900&height=600&name=6dd287a92a7634f995bd8fa26c99da16_f214.jpg)
Indonesia
FREY ABADI INDOTAMA Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/8d9337646c7c85a8b63bbd2569a3566d_f228.jpg?width=900&height=600&name=8d9337646c7c85a8b63bbd2569a3566d_f228.jpg)
Indonesia
JID Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/675f271ec97173b3c363706aaefb110f_f203.jpg?width=900&height=600&name=675f271ec97173b3c363706aaefb110f_f203.jpg)
Indonesia
SANKO GOSEI TECHNOLOGY Indonesia Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/141f8be8e7258fcca4a570741cd43a71_f1654.jpg?width=900&height=600&name=141f8be8e7258fcca4a570741cd43a71_f1654.jpg)
Singapore
YAMAZAKI MAZAK Factory Extension
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/78be87af5868dd752c9dabb6eba85600_f137.jpg?width=900&height=600&name=78be87af5868dd752c9dabb6eba85600_f137.jpg)
Singapore
NATIONAL GALLERY SINGAPORE
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/9ff55ea1b427e57dd1e077cb5eab9fde_f1653.jpg?width=900&height=393&name=9ff55ea1b427e57dd1e077cb5eab9fde_f1653.jpg)
Singapore
LASALLE College of the Arts
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/9fcc237832e394a2ebeccb29894e9979_f130.jpg?width=900&height=600&name=9fcc237832e394a2ebeccb29894e9979_f130.jpg)
Singapore
Office Annex Building
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/cd649c5b4610ef9a85cbbe55b3fab0fc_f129.jpg?width=900&height=598&name=cd649c5b4610ef9a85cbbe55b3fab0fc_f129.jpg)
Singapore
HEWLETT PACKARD Ink Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/6d9caed4a3646f2ecfc4cb79f2efe18d_f113.jpg?width=1620&height=1080&name=6d9caed4a3646f2ecfc4cb79f2efe18d_f113.jpg)
Singapore
CHANGI INTERNATIONAL AIRPORT Terminal 2 Upgrading
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/f9a92489e03ed8f443fc5ae93f806c78_f1652.jpg?width=900&height=600&name=f9a92489e03ed8f443fc5ae93f806c78_f1652.jpg)
Singapore
CHANGI INTERNATIONAL AIRPORT Terminal 1 Upgrading
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/2959189ccf7cb3f99b96deb9e1b1fe4f_f114.jpg?width=900&height=600&name=2959189ccf7cb3f99b96deb9e1b1fe4f_f114.jpg)
Singapore
BECTON DICKINSON Annex Office
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/1f61f5a5fdf0a8b86d4bb07fdf4c0e3e_f91.png?width=900&height=601&name=1f61f5a5fdf0a8b86d4bb07fdf4c0e3e_f91.png)
Thailand
TYE-S New Plant
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/0ba4630156833a6692ab85f472359758_f290.jpg?width=1620&height=1080&name=0ba4630156833a6692ab85f472359758_f290.jpg)
Thailand
TOYOTA BUZZ RAMA2
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/20067706dd4687322bf2fd84387781f2_f291.jpg?width=1000&height=667&name=20067706dd4687322bf2fd84387781f2_f291.jpg)
Thailand
TOYOTA BUZZ CHAINAT
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/c73cffacd522f9a4a384a73f0dc7c1ab_f87.png?width=900&height=601&name=c73cffacd522f9a4a384a73f0dc7c1ab_f87.png)
Thailand
A&M Factory Phase 1
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/782269ac34d058b5ab115bc7c2bd221d_f86.png?width=900&height=601&name=782269ac34d058b5ab115bc7c2bd221d_f86.png)
Thailand
IIDA ELECTRONICS New Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/b52d055c5f7a1521278e85f0ec8b9000_f85.png?width=900&height=601&name=b52d055c5f7a1521278e85f0ec8b9000_f85.png)
Thailand
TTTC EASTERN SEABOARD BRANCH (Office)
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/ad13153f96f6acfec0def0ebf2096699_f83.png?width=900&height=601&name=ad13153f96f6acfec0def0ebf2096699_f83.png)
Thailand
TBKK Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/da741124302d3adfd92e99101b2e6ef3_f81.png?width=900&height=601&name=da741124302d3adfd92e99101b2e6ef3_f81.png)
Thailand
KJT BANPHO Factory 1
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/c3df227dd7055513e75d4ccfe474ca60_f79.png?width=900&height=601&name=c3df227dd7055513e75d4ccfe474ca60_f79.png)
Thailand
SUZUYO BANGPLEE Warehouse Phase 1
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/4062dddc48f8923374a3f6cd7640d379_f78.png?width=900&height=601&name=4062dddc48f8923374a3f6cd7640d379_f78.png)
Thailand
SPARKTEC-TH Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/eda5e6bab27a453115b7fa39eef7ce34_f77.png?width=900&height=601&name=eda5e6bab27a453115b7fa39eef7ce34_f77.png)
Thailand
JTEKT (THAILAND) CO., LTD. Gateway Plant
![ffe71a2171a0756e4050dbd89586db47_f75](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/ffe71a2171a0756e4050dbd89586db47_f75.png?width=900&height=601&name=ffe71a2171a0756e4050dbd89586db47_f75.png)
Thailand
ALINCO (THAILAND) New Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/68159b9a7b6d88a278eec605a956fded_f73.png?width=900&height=601&name=68159b9a7b6d88a278eec605a956fded_f73.png)
Thailand
MEGA TNC (RSP Plant)
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/44ad6b6ad269bacc553acc3cbe8aab82_f68.png?width=900&height=601&name=44ad6b6ad269bacc553acc3cbe8aab82_f68.png)
Thailand
MAJEND MAKCS Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/f0597a6b88005d42cc1707b8fdb384a4_f67.png?width=900&height=601&name=f0597a6b88005d42cc1707b8fdb384a4_f67.png)
Thailand
TOYOTOMI KIKO New Factory
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/dca50b56e6b4c2a731cb114401c8ff9b_f69.png?width=900&height=601&name=dca50b56e6b4c2a731cb114401c8ff9b_f69.png)
Thailand
AISIN AI Factory 3
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/c3e5c09f4bef01a549cfd256364135a0_f66.png?width=900&height=601&name=c3e5c09f4bef01a549cfd256364135a0_f66.png)
Thailand
KOKUYO-IK Factory 2
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/9ea2ed39825d5832ea74a5849877f9aa_f401.png?width=900&height=601&name=9ea2ed39825d5832ea74a5849877f9aa_f401.png)
Thailand
META Factory 4
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/3087376396efffec867b4d544a2e1f13_f64.png?width=900&height=601&name=3087376396efffec867b4d544a2e1f13_f64.png)
Thailand
HMST HEAD Office Renovation
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/c40e44f670360571e03b90b1aa3bde05_f61.png?width=900&height=601&name=c40e44f670360571e03b90b1aa3bde05_f61.png)
Thailand
FUSERASHI (THAILAND) Factory Phase 2
Coming Soon
- PREV
- NEXT
![2018-Continental_Tires_Thailand_New_Plant](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/2018-Continental_Tires_Thailand_New_Plant%20(2).webp?width=1234&height=700&name=2018-Continental_Tires_Thailand_New_Plant%20(2).webp)
Thailand
Continental Tires Thailand New Plant
Completion year | 2018 |
Client | Continental Tyres (Thailand) Co., Ltd. |
Location | Hemaraj Eastern Seaboard Industrial Estate, Rayong, Bangkok |
Design | Archetype Thailand |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 99,490 m2 |
![01-DSC_8592](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-DSC_8592_copy2.jpg?width=2638&height=2683&name=01-DSC_8592_copy2.jpg)
![02-DSC_8612_copy](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-DSC_8612_copy.webp?width=2752&height=4128&name=02-DSC_8612_copy.webp)
![03-DSC_8705-copy](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-DSC_8705-copy.jpg?width=3894&height=2589&name=03-DSC_8705-copy.jpg)
![04-DSC_8719](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-DSC_8719.jpg?width=4128&height=2752&name=04-DSC_8719.jpg)
Singapore
Changi International Airport Terminal 1 West Lounge
Completion year | 2021 |
Client | Changi Airport Group (Singapore) Pte Ltd |
Location | Changi, Singapore |
Design | RSP Architects Planners & Engineers (Pte) Ltd |
Construction | Takenaka Corporation |
Building Type | Airport |
Total Floor Area | 3,800 m2 |
![02-DSC_8651-2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-DSC_8651-2.webp?width=1050&height=700&name=02-DSC_8651-2.webp)
![03-DSC_8481-4](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-DSC_8481-4.webp?width=1050&height=700&name=03-DSC_8481-4.webp)
![01-DSC_8643-2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-DSC_8643-2.webp?width=1050&height=700&name=01-DSC_8643-2.webp)
Singapore
Changi International Airport Terminal 1 Fixed Gangways
Completion year | 2021 |
Client | Changi Airport Group (Singapore) Pte Ltd |
Location | Changi, Singapore |
Design | RSP Architects Planners & Engineers (Pte) Ltd |
Construction | Takenaka Corporation |
Building Type | Airport |
Total Floor Area | 13,500 m2 |
![IKEA-MY-2020_2_900-600_pix](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IKEA-MY-2020_2_900-600_pix.jpg?width=900&height=600&name=IKEA-MY-2020_2_900-600_pix.jpg)
![IKEA-MY-2020_3_900-600_pix](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IKEA-MY-2020_3_900-600_pix.jpg?width=900&height=600&name=IKEA-MY-2020_3_900-600_pix.jpg)
![IKEA-MY-2020_4_900-600_pix](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IKEA-MY-2020_4_900-600_pix.jpg?width=900&height=600&name=IKEA-MY-2020_4_900-600_pix.jpg)
![IKEA-MY-2020_5_900-600_pix](https://takenaka.asia/hs-fs/hubfs/IKEA-MY-2020_5_900-600_pix.jpg?width=900&height=600&name=IKEA-MY-2020_5_900-600_pix.jpg)
![IKEA-MY-2020_6_900-600_pix](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IKEA-MY-2020_6_900-600_pix.jpg?width=600&height=899&name=IKEA-MY-2020_6_900-600_pix.jpg)
![IKEA-MY-2020_7_900-600_pix](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IKEA-MY-2020_7_900-600_pix.jpg?width=900&height=600&name=IKEA-MY-2020_7_900-600_pix.jpg)
![IKEA-MY-2020_1900-600pix](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IKEA-MY-2020_1900-600pix.jpg?width=900&height=572&name=IKEA-MY-2020_1900-600pix.jpg)
Malaysia
IKEA DISTRIBUTION CENTRE PORT KLANG
Completion year | 2020 |
Client | IKEA Supply (Malaysia) Sdn Bhd |
Location | Port Klang |
Design | Takenaka (Malaysia) Sdn. Bhd. |
Construction | Takenaka (Malaysia) Sdn. Bhd. |
Building Type | Warehouse |
Total Floor Area | 94,906 m2 |
![01-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-1.webp?width=1501&height=1000&name=01-1.webp)
![02-DJI_0182-resized](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-DJI_0182-resized.webp?width=1501&height=1000&name=02-DJI_0182-resized.webp)
![03-_MG_5335-resized](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-_MG_5335-resized.jpg?width=5065&height=3555&name=03-_MG_5335-resized.jpg)
![04-_MG_5345-resized](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-_MG_5345-resized.jpg?width=4872&height=3249&name=04-_MG_5345-resized.jpg)
![05-DJI_0202-resized](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-DJI_0202-resized.jpg?width=4975&height=3711&name=05-DJI_0202-resized.jpg)
Vietnam
NAKASHIMA VIETNAM Factory (Phase 2)
Completion year | 2019 |
Client | Nakashima Vietnam Co., Ltd. |
Location | Binh Duong Province, Vietnam |
Design | Takenaka Vietnam Co., Ltd. |
Construction | Takenaka Vietnam Co., Ltd. |
Building Type | Factory |
Total Floor Area | 1,720m2 |
![02-SOUTH_VIEW](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-SOUTH_VIEW.webp?width=1500&height=1000&name=02-SOUTH_VIEW.webp)
![03-WEST_VIEW](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-WEST_VIEW.webp?width=1500&height=1000&name=03-WEST_VIEW.webp)
![04-NORTH_VIEW-resized](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-NORTH_VIEW-resized.webp?width=1500&height=1000&name=04-NORTH_VIEW-resized.webp)
![05-ENTRANCE_HALL](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-ENTRANCE_HALL.webp?width=1500&height=1000&name=05-ENTRANCE_HALL.webp)
![06-ENTRANCE_HALL-resized](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06-ENTRANCE_HALL-resized.webp?width=1500&height=1000&name=06-ENTRANCE_HALL-resized.webp)
![07-ENTRANCE_HALL_UPPER_VIEW](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/07-ENTRANCE_HALL_UPPER_VIEW.webp?width=1500&height=1000&name=07-ENTRANCE_HALL_UPPER_VIEW.webp)
![08-WALKWAY1F-resized](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/08-WALKWAY1F-resized.webp?width=1500&height=1000&name=08-WALKWAY1F-resized.webp)
![01-ENTRANCE_FACADE](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-ENTRANCE_FACADE.webp?width=1498&height=1000&name=01-ENTRANCE_FACADE.webp)
Myanmar
TOYO INK MYANMAR THILAWA Factory
Completion year | 2019 |
Client | Toyo Ink Myanmar Co., Ltd. |
Location | Thilawa SEZ, Yangon, Myanmar |
Design | Takenaka Myanmar |
Construction | Takenaka Myanmar |
Building Type | Factory |
Total Floor Area | 3,329 m2 |
![CMN-998-_DSC0013](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/CMN-998-_DSC0013.jpg?width=600&height=899&name=CMN-998-_DSC0013.jpg)
![2015_SG_Brochure-MST_Night](https://takenaka.asia/hs-fs/hubfs/2015_SG_Brochure-MST_Night.jpg?width=385&height=513&name=2015_SG_Brochure-MST_Night.jpg)
![CMN-998-MLD_0054](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/CMN-998-MLD_0054.jpg?width=600&height=899&name=CMN-998-MLD_0054.jpg)
![CMN-998-MLD_0028](https://takenaka.asia/hs-fs/hubfs/CMN-998-MLD_0028.jpg?width=600&height=906&name=CMN-998-MLD_0028.jpg)
![CMN-998-MLD_0068](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/CMN-998-MLD_0068.jpg?width=900&height=599&name=CMN-998-MLD_0068.jpg)
Singapore
CAPITAGREEN
Completion year | 2014 |
Client | CapitaLand Commercial Ltd |
Location | Market Street, Singapore |
Design | Toyo Ito & Associates / RSP Architects Planners & Engineers (Pte) Ltd / Takenaka Corporation Singapore Office (Detailed Design) |
Construction | Takenaka Corporation Singapore Office |
Building Type | Office |
Total Floor Area | 82,000m2 |
![01-08](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-08.jpg?width=900&height=600&name=01-08.jpg)
![02-CMN-998-02](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-CMN-998-02.jpg?width=600&height=859&name=02-CMN-998-02.jpg)
![03-19](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-19.jpg?width=600&height=961&name=03-19.jpg)
![04-17](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-17.jpg?width=900&height=600&name=04-17.jpg)
![05-22](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-22.jpg?width=900&height=600&name=05-22.jpg)
![06-24](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06-24.jpg?width=900&height=907&name=06-24.jpg)
![07-25](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/07-25.jpg?width=600&height=900&name=07-25.jpg)
![20](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/20.jpg?width=900&height=633&name=20.jpg)
![BP-110923_125224](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/BP-110923_125224.jpg?width=900&height=649&name=BP-110923_125224.jpg)
![X-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/X-1.jpg?width=900&height=583&name=X-1.jpg)
![X-01](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/X-01.jpg?width=600&height=863&name=X-01.jpg)
Singapore
Office HQ Building 2
Completion year | 2011 |
Client | Undisclosed |
Location | North Canal Road, Singapore |
Design | Tange Associates / DCA Architects Pte Ltd |
Construction | Takenaka Corporation Singapore Office |
Building Type | Office - Interior |
Total Floor Area | 5,400m2 |
![MORI0022_copy](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MORI0022_copy.jpg?width=900&height=600&name=MORI0022_copy.jpg)
![MORI0105-HDR](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MORI0105-HDR.jpg?width=900&height=600&name=MORI0105-HDR.jpg)
Singapore
CHANGI INTERNATIONAL AIRPORT Terminal 1 Upgrading 2
Completion year | 2011 |
Client | Changi Airport Group (Singapore) Pte Ltd |
Location | Changi, Singapore |
Design | Woodhead Pte Ltd / Architects 61 Pte Ltd |
Construction | Takenaka Corporation Singapore Office |
Building Type | Airport - Interior |
Total Floor Area | 184,800m2 |
![2015_SG_Brochure-Showa_Denko](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/2015_SG_Brochure-Showa_Denko.jpg?width=316&height=203&name=2015_SG_Brochure-Showa_Denko.jpg)
Singapore
SHOWA DENKO HD Singapore Factory
Completion year | 2006 |
Client | Showa Denko HD Singapore Pte Ltd |
Location | Pioneer Crescent, Singapore |
Design | Takenaka Corporation Tokyo / RSP Architects Planners & Engineers (Pte) Ltd |
Construction | Takenaka Corporation Singapore Office |
Building Type | Industrial |
Total Floor Area | 111,000m2 |
![CMN-998-07](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/CMN-998-07.jpg?width=1000&height=1500&name=CMN-998-07.jpg)
![CMN-998-18](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/CMN-998-18.jpg?width=1000&height=666&name=CMN-998-18.jpg)
Singapore
THE SINGAPORE FLYER
Completion year | 2008 |
Client | Singapore Flyer Pte Ltd |
Location | Raffles Avenue, Singapore |
Design | Kisho Kurokawa Architect & Associates / DP Architects Pte Ltd |
Construction | Takenaka Corporation Singapore Office |
Building Type | Recreational |
Total Floor Area | 14,000m2 |
![CMN-998-MLD_0028](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/CMN-998-MLD_0028.jpg?width=600&height=906&name=CMN-998-MLD_0028.jpg)
![CMN-998-MLD_0068](https://takenaka.asia/hs-fs/hubfs/CMN-998-MLD_0068.jpg?width=900&height=599&name=CMN-998-MLD_0068.jpg)
Singapore
CAPITAGREEN
Completion year | 2014 |
Client | CapitaLand Commercial Ltd |
Location | Market Street, Singapore |
Design | Toyo Ito & Associates / RSP Architects Planners & Engineers (Pte) Ltd / Takenaka Corporation Singapore Office (Detailed Design) |
Construction | Takenaka Corporation Singapore Office |
Building Type | Office - Interior |
Total Floor Area | 82,000m2 |
![01-08-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-08-1.jpg?width=900&height=600&name=01-08-1.jpg)
![02-CMN-998-02-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-CMN-998-02-1.jpg?width=600&height=859&name=02-CMN-998-02-1.jpg)
![03-19-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-19-1.jpg?width=600&height=961&name=03-19-1.jpg)
![04-17-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-17-1.jpg?width=900&height=600&name=04-17-1.jpg)
![05-22-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-22-1.jpg?width=900&height=600&name=05-22-1.jpg)
![06-24](https://takenaka.asia/hs-fs/hubfs/06-24.jpg?width=900&height=907&name=06-24.jpg)
![07-25](https://takenaka.asia/hs-fs/hubfs/07-25.jpg?width=600&height=900&name=07-25.jpg)
![20](https://takenaka.asia/hs-fs/hubfs/20.jpg?width=900&height=633&name=20.jpg)
![BP-110923_125224](https://takenaka.asia/hs-fs/hubfs/BP-110923_125224.jpg?width=900&height=649&name=BP-110923_125224.jpg)
![X-1-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/X-1-1.jpg?width=900&height=583&name=X-1-1.jpg)
![X-01](https://takenaka.asia/hs-fs/hubfs/X-01.jpg?width=600&height=863&name=X-01.jpg)
Singapore
Office HQ Building
Completion year | 2011 |
Client | Undisclosed |
Location | North Canal Road, Singapore |
Design | Tange Associates / DCA Architects Pte Ltd |
Construction | Takenaka Corporation Singapore Office |
Building Type | Office |
Total Floor Area | 5,400m2 |
![01-Night_view_of_main_building](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-Night_view_of_main_building.jpg?width=900&height=597&name=01-Night_view_of_main_building.jpg)
![02-2014_SG_Brochure-ELS01](https://takenaka.asia/hs-fs/hubfs/02-2014_SG_Brochure-ELS01.jpg?width=900&height=674&name=02-2014_SG_Brochure-ELS01.jpg)
![03-ELS_Ph12](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-ELS_Ph12.jpg?width=900&height=252&name=03-ELS_Ph12.jpg)
![04-2014_SG_Brochure-ELS02](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-2014_SG_Brochure-ELS02.jpg?width=1022&height=963&name=04-2014_SG_Brochure-ELS02.jpg)
![05-ELS_Ph2a](https://takenaka.asia/hs-fs/hubfs/05-ELS_Ph2a.jpg?width=900&height=523&name=05-ELS_Ph2a.jpg)
![06-ELS_Ph2b](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06-ELS_Ph2b.jpg?width=900&height=473&name=06-ELS_Ph2b.jpg)
![07-Outside01](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/07-Outside01.jpg?width=900&height=384&name=07-Outside01.jpg)
![08-Main_Reception](https://takenaka.asia/hs-fs/hubfs/08-Main_Reception.jpg?width=600&height=904&name=08-Main_Reception.jpg)
![X5_Overall_Front_View](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/X5_Overall_Front_View.jpg?width=900&height=597&name=X5_Overall_Front_View.jpg)
Singapore
EDWARDS LIFESCIENCES Plant Phase 2
Completion year | 2013 |
Client | Edwards Lifesciences (Singapore) Pte Ltd |
Location | Changi North Crescent, Singapore |
Design | AWP Pte Ltd |
Construction | Takenaka Corporation Singapore Office |
Building Type | Industrial |
Total Floor Area | 14,450m2 |
![03-Hokkaido_Marche_2018](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-Hokkaido_Marche_2018.jpg?width=900&height=600&name=03-Hokkaido_Marche_2018.jpg)
![02-OCHA6539](https://takenaka.asia/hs-fs/hubfs/02-OCHA6539.jpg?width=900&height=600&name=02-OCHA6539.jpg)
![01-OCHA6532_R](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-OCHA6532_R.jpg?width=900&height=600&name=01-OCHA6532_R.jpg)
Singapore
A&A Works to HOKKAIDO MARCHE
Completion year | 2018 |
Client | Hokkaido Marche Singapore Pte Ltd |
Location | 181 Orchard Road, Singapore |
Design | Takenaka Corporation Singapore Office |
Construction | Takenaka Corporation Singapore Office |
Building Type | Retail - Interior |
Total Floor Area | 388m2 |
![01-20180923_133038](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-20180923_133038.jpg?width=900&height=675&name=01-20180923_133038.jpg)
![02-20180923_104329](https://takenaka.asia/hs-fs/hubfs/02-20180923_104329.jpg?width=900&height=675&name=02-20180923_104329.jpg)
![03-20180923_084327](https://takenaka.asia/hs-fs/hubfs/03-20180923_084327.jpg?width=900&height=675&name=03-20180923_084327.jpg)
Singapore
SELETAR AIRPORT
Completion year | 2018 |
Client | Changi Airport Group (S) Pte Ltd |
Location | Seletar Aerospace Road 1, Singapore |
Design | 3HPArchitects Pte Ltd |
Construction | Takenaka Corporation Singapore Office |
Building Type | Airport |
Total Floor Area | 9,950m2 |
![01-T4_0275](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-T4_0275.jpg?width=900&height=398&name=01-T4_0275.jpg)
![02-T4_0431](https://takenaka.asia/hs-fs/hubfs/02-T4_0431.jpg?width=900&height=396&name=02-T4_0431.jpg)
![03-T4_0430](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-T4_0430.jpg?width=900&height=552&name=03-T4_0430.jpg)
![04-T4_0179](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-T4_0179.jpg?width=900&height=600&name=04-T4_0179.jpg)
![05-T4_0204](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-T4_0204.jpg?width=900&height=508&name=05-T4_0204.jpg)
![06-T4_0215](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06-T4_0215.jpg?width=600&height=900&name=06-T4_0215.jpg)
![07-T4_0089](https://takenaka.asia/hs-fs/hubfs/07-T4_0089.jpg?width=900&height=598&name=07-T4_0089.jpg)
![08-T4_0118](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/08-T4_0118.jpg?width=900&height=597&name=08-T4_0118.jpg)
![09-T4_0146](https://takenaka.asia/hs-fs/hubfs/09-T4_0146.jpg?width=900&height=600&name=09-T4_0146.jpg)
![10-T4_0109](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/10-T4_0109.jpg?width=900&height=601&name=10-T4_0109.jpg)
Singapore
CHANGI INTERNATIONAL AIRPORT Terminal 4
Completion year | 2017 |
Client | Changi Airport Group (S) Pte Ltd |
Location | Airport Boulevard, Singapore |
Design | Benoy Limited / SAA Architects Pte Ltd Design Development: Takenaka Corporation Singapore Office |
Construction | Takenaka Corporation Singapore Office |
Building Type | Airport |
Total Floor Area | 286,000m (Main Terminal and Ancillary Building)2 |
![01-Canon_Machinery_-_10-2016_amend_1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-Canon_Machinery_-_10-2016_amend_1.jpg?width=824&height=509&name=01-Canon_Machinery_-_10-2016_amend_1.jpg)
![02-Canon_Machinery_-_04_-_1953_1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-Canon_Machinery_-_04_-_1953_1.jpg?width=824&height=436&name=02-Canon_Machinery_-_04_-_1953_1.jpg)
Malaysia
CANON MACHINERY Factory Extension
Completion year | 2019 |
Client | Canon Machinery (Malaysia) Sdn Bhd |
Location | Shah Alam |
Design | Takenaka (Malaysia) Sdn. Bhd. |
Construction | Takenaka (Malaysia) Sdn. Bhd. |
Building Type | Factory |
Total Floor Area |
![65cd10f73be4d36afebe461cf53be43d_f1428](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/65cd10f73be4d36afebe461cf53be43d_f1428.jpg?width=824&height=549&name=65cd10f73be4d36afebe461cf53be43d_f1428.jpg)
![65cd10f73be4d36afebe461cf53be43d_f1428](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/65cd10f73be4d36afebe461cf53be43d_f1428.jpg?width=824&height=549&name=65cd10f73be4d36afebe461cf53be43d_f1428.jpg)
Malaysia
SMM/SMS New Factory
Completion year | 2018 |
Client | Sato Malaysia Electronics Manufacturing Sdn. Bhd. |
Location | Bandar Bukit Raja |
Design | Takenaka (M) Sdn. Bhd. |
Construction | Takenaka (M) Sdn. Bhd. |
Building Type | Factory |
Total Floor Area | 11,934m2 |
![Hirose-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Hirose-1.jpg?width=824&height=549&name=Hirose-1.jpg)
![Hirose-2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Hirose-2.jpg?width=824&height=549&name=Hirose-2.jpg)
Malaysia
HIROSE Factory Extension
Completion year | 2017 |
Client | Hirose Electric (M) Sdn. Bhd. |
Location | Shah Alam |
Design | Takenaka (M) Sdn. Bhd. |
Construction | Takenaka (M) Sdn. Bhd. |
Building Type | Factory |
Total Floor Area | 2,385m2 |
![Pepsico_1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Pepsico_1.jpg?width=900&height=505&name=Pepsico_1.jpg)
![Page_06](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Page_06.jpg?width=900&height=600&name=Page_06.jpg)
![Page_10](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Page_10.jpg?width=900&height=600&name=Page_10.jpg)
![Page_12](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Page_12.jpg?width=900&height=600&name=Page_12.jpg)
![Page_14](https://takenaka.asia/hs-fs/hubfs/Page_14.jpg?width=900&height=600&name=Page_14.jpg)
![Page_15](https://takenaka.asia/hs-fs/hubfs/Page_15.jpg?width=900&height=600&name=Page_15.jpg)
![Page_16](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Page_16.jpg?width=900&height=600&name=Page_16.jpg)
![Page_17](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Page_17.jpg?width=900&height=600&name=Page_17.jpg)
Thailand
PEPSICO Thai New Factory 1
Completion year | 2016 |
Client | International Refreshment (Thailand) Co., Ltd. |
Location | Nong Khae Industrail Estate, Saraburi Province |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 34,620m2 |
![image-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/6618ff34e7ec7a190a3914346d0a5e4f_f1361-1.jpg?width=900&height=600&name=6618ff34e7ec7a190a3914346d0a5e4f_f1361-1.jpg)
Thailand
HOWA New Factory 2
Completion year | 2018 |
Client | HOWA (Thailand) Co., Ltd. |
Location | Amata Nakorn Industrial Estate, Chonburi Province |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 5,721m2 |
![1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/1.jpg?width=900&height=600&name=1.jpg)
![2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/2.jpg?width=900&height=600&name=2.jpg)
![3](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/3.jpg?width=900&height=600&name=3.jpg)
![4](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/4.jpg?width=900&height=600&name=4.jpg)
![5](https://takenaka.asia/hs-fs/hubfs/5.jpg?width=900&height=600&name=5.jpg)
![6](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/6.jpg?width=900&height=1350&name=6.jpg)
![7](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/7.jpg?width=900&height=600&name=7.jpg)
![8](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/8.jpg?width=900&height=600&name=8.jpg)
Thailand
IM ELECTRONICS Bangpoo Factory
Completion year | 2018 |
Client | IM Electronics Thailand Co., Ltd. |
Location | North Bangpoo Industrial Estate |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 7,077m2 |
![DAIKIN_-_1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DAIKIN_-_1.jpg?width=900&height=600&name=DAIKIN_-_1.jpg)
![DAIKIN_-_2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DAIKIN_-_2.jpg?width=900&height=600&name=DAIKIN_-_2.jpg)
![DAIKIN_-_3](https://takenaka.asia/hs-fs/hubfs/DAIKIN_-_3.jpg?width=900&height=1350&name=DAIKIN_-_3.jpg)
![DAIKIN_-_4](https://takenaka.asia/hs-fs/hubfs/DAIKIN_-_4.jpg?width=900&height=1350&name=DAIKIN_-_4.jpg)
![DAIKIN_-_6](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DAIKIN_-_6.jpg?width=900&height=600&name=DAIKIN_-_6.jpg)
![DAIKIN_-_5](https://takenaka.asia/hs-fs/hubfs/DAIKIN_-_5.jpg?width=900&height=600&name=DAIKIN_-_5.jpg)
![DAIKIN_-_7](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DAIKIN_-_7.jpg?width=900&height=600&name=DAIKIN_-_7.jpg)
![DAIKIN_-_8](https://takenaka.asia/hs-fs/hubfs/DAIKIN_-_8.jpg?width=900&height=600&name=DAIKIN_-_8.jpg)
Thailand
DIT New Research & Development Center
Completion year | 2016 |
Client | DAIKIN INDUSTRIES (THAILAND) LTD. |
Location | Amata City Chonburi Industrial Estate, Chonburi Province |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | R&D Building |
Total Floor Area | 6,961 SQM |
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/80cb8891f6f41f7c03f92d3f5cecfebe_f1340.jpg?width=900&height=600&name=80cb8891f6f41f7c03f92d3f5cecfebe_f1340.jpg)
![2](https://takenaka.asia/hs-fs/hubfs/2.jpg?width=900&height=675&name=2.jpg)
![3-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/3-1.jpg?width=900&height=600&name=3-1.jpg)
![4-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/4-1.jpg?width=900&height=1350&name=4-1.jpg)
![5](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/5.jpg?width=900&height=600&name=5.jpg)
Thailand
DAIWA KASEI (THAILAND) CO., LTD. Prachinburi Factory
Completion year | 2016 |
Client | Daiwa Kasei (Thailand) Co., Ltd. |
Location | Prachinburi |
Design | MARCHI |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 46,678m2 |
![DMG_MORI_1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DMG_MORI_1.jpg?width=900&height=600&name=DMG_MORI_1.jpg)
![DMG_MORI_2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DMG_MORI_2.jpg?width=900&height=600&name=DMG_MORI_2.jpg)
![DMG_MORI_3](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DMG_MORI_3.jpg?width=900&height=600&name=DMG_MORI_3.jpg)
![DMG_MORI_4](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DMG_MORI_4.jpg?width=900&height=600&name=DMG_MORI_4.jpg)
![DMG_MORI_5](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DMG_MORI_5.jpg?width=900&height=600&name=DMG_MORI_5.jpg)
Thailand
DMG MORI Amata Nakorn T.C. Project
Completion year | 2016 |
Client | DMG MORI (THAILAND) CO., LTD. |
Location | Amata Nakorn Industrial Estate, Chonburi Province |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 1,292m2 |
![OSB0613_option_2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/OSB0613_option_2.jpg?width=900&height=599&name=OSB0613_option_2.jpg)
![01-DJI_04810-selected](https://takenaka.asia/hs-fs/hubfs/01-DJI_04810-selected.jpg?width=900&height=503&name=01-DJI_04810-selected.jpg)
![02-DJI_0501-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-DJI_0501-selected.jpg?width=900&height=506&name=02-DJI_0501-selected.jpg)
![03-_OSB4884-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-_OSB4884-selected.jpg?width=900&height=599&name=03-_OSB4884-selected.jpg)
![04-_OSB4783-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-_OSB4783-selected.jpg?width=900&height=599&name=04-_OSB4783-selected.jpg)
India
KOKOKU Factory Phase 2
Completion year | 2018 |
Client | KOKOKU INTECH |
Location | Neemrana, Rajasthan |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Factory |
Total Floor Area | 8,581m2 |
![01-NEDO_1-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-NEDO_1-selected.jpg?width=900&height=600&name=01-NEDO_1-selected.jpg)
![02-NEDO_2-selected](https://takenaka.asia/hs-fs/hubfs/02-NEDO_2-selected.jpg?width=900&height=600&name=02-NEDO_2-selected.jpg)
![03-NEDO_4-selected](https://takenaka.asia/hs-fs/hubfs/03-NEDO_4-selected.jpg?width=900&height=600&name=03-NEDO_4-selected.jpg)
![04-NEDO_7-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-NEDO_7-selected.jpg?width=900&height=600&name=04-NEDO_7-selected.jpg)
India
NEDO Office Interior
Completion year | 2018 |
Client | NEDO |
Location | Delhi |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Interior |
Total Floor Area | 160.25 SQM |
![01-DSC_0003-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-DSC_0003-selected.jpg?width=900&height=522&name=01-DSC_0003-selected.jpg)
![02-DSC_0010-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-DSC_0010-selected.jpg?width=900&height=595&name=02-DSC_0010-selected.jpg)
![03-DSC_0039-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/03-DSC_0039-selected.jpg?width=900&height=632&name=03-DSC_0039-selected.jpg)
![04-DSC_0136-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-DSC_0136-selected.jpg?width=900&height=523&name=04-DSC_0136-selected.jpg)
![05-DSC_0170-selected](https://takenaka.asia/hs-fs/hubfs/05-DSC_0170-selected.jpg?width=900&height=673&name=05-DSC_0170-selected.jpg)
India
FUTABA New Factory
Completion year | 2018 |
Client | FUTABA |
Location | SMG Factory / Supplier Park, Gujarat |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Factory |
Total Floor Area | 7,910m2 |
![01-_SBS2885-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-_SBS2885-selected.jpg?width=900&height=681&name=01-_SBS2885-selected.jpg)
![02-_SBS2920-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-_SBS2920-selected.jpg?width=900&height=623&name=02-_SBS2920-selected.jpg)
![03-_SBS2788-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-_SBS2788-selected.jpg?width=900&height=669&name=03-_SBS2788-selected.jpg)
![04-_SBS2652-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-_SBS2652-selected.jpg?width=900&height=451&name=04-_SBS2652-selected.jpg)
![05-_SBS2488-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-_SBS2488-selected.jpg?width=900&height=600&name=05-_SBS2488-selected.jpg)
India
YKK INDIA Factory Extension
Completion year | 2017 |
Client | YKK |
Location | Bawal, Haryana |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Factory |
Total Floor Area | 21,448.5 SQM |
![01-_SBS3561-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-_SBS3561-selected.jpg?width=900&height=593&name=01-_SBS3561-selected.jpg)
![02-_SBS3574-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-_SBS3574-selected.jpg?width=900&height=595&name=02-_SBS3574-selected.jpg)
India
INDIA JAPAN LIGHTING Phase-2 Factory
Completion year | 2017 |
Client | INDIA JAPAN LIGHTING PVT. LTD. |
Location | Bawal, Haryana |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Factory |
Total Floor Area | 9,731m2 |
![DJI_0144](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DJI_0144.jpg?width=900&height=546&name=DJI_0144.jpg)
![01-DJI_0102-selected](https://takenaka.asia/hs-fs/hubfs/01-DJI_0102-selected.jpg?width=900&height=426&name=01-DJI_0102-selected.jpg)
![DJI_0144](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DJI_0144.jpg?width=900&height=546&name=DJI_0144.jpg)
![03-_SBS6136-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-_SBS6136-selected.jpg?width=900&height=477&name=03-_SBS6136-selected.jpg)
![04-_SBS6189-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-_SBS6189-selected.jpg?width=900&height=603&name=04-_SBS6189-selected.jpg)
![05-_SBS6192-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-_SBS6192-selected.jpg?width=900&height=579&name=05-_SBS6192-selected.jpg)
India
DAIPL Phase 2 Factory
Completion year | 2017 |
Client | DAIKIN |
Location | Neemrana, Rajasthan |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Factory |
Total Floor Area | 39,164.63 SQM |
![01-DSC_0005-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-DSC_0005-selected.jpg?width=900&height=600&name=01-DSC_0005-selected.jpg)
![02-DSC_0003-selected](https://takenaka.asia/hs-fs/hubfs/02-DSC_0003-selected.jpg?width=900&height=600&name=02-DSC_0003-selected.jpg)
![03-DSC_0019-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-DSC_0019-selected.jpg?width=900&height=600&name=03-DSC_0019-selected.jpg)
![04-DSC_0021-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-DSC_0021-selected.jpg?width=900&height=600&name=04-DSC_0021-selected.jpg)
![05-DSC_0036-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-DSC_0036-selected.jpg?width=900&height=600&name=05-DSC_0036-selected.jpg)
![06-DSC_0052-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06-DSC_0052-selected.jpg?width=900&height=591&name=06-DSC_0052-selected.jpg)
![07-DSC_0060-selected](https://takenaka.asia/hs-fs/hubfs/07-DSC_0060-selected.jpg?width=900&height=600&name=07-DSC_0060-selected.jpg)
![08-DSC_0078-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/08-DSC_0078-selected.jpg?width=900&height=600&name=08-DSC_0078-selected.jpg)
![09-DSC_0080-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/09-DSC_0080-selected.jpg?width=900&height=608&name=09-DSC_0080-selected.jpg)
India
FCC New Factory
Completion year | 2017 |
Client | FCC |
Location | Sanand, Gujarat |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Factory |
Total Floor Area | 9,165m2 |
![Aerial_Image_of_Toyo_INK_Plant_updated_1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Aerial_Image_of_Toyo_INK_Plant_updated_1.jpg?width=900&height=459&name=Aerial_Image_of_Toyo_INK_Plant_updated_1.jpg)
India
TOYO INK Factory Extension
Completion year | 2017 |
Client | TOYO INK |
Location | DAHEJ, GUJARAT |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Industrial |
Total Floor Area | 2,341m2 |
![TMEIC_PE_03_1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/TMEIC_PE_03_1.jpg?width=900&height=600&name=TMEIC_PE_03_1.jpg)
![01-TMEIC_PE_02-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-TMEIC_PE_02-selected.jpg?width=900&height=440&name=01-TMEIC_PE_02-selected.jpg)
![02-TMEIC_PE_32-selected](https://takenaka.asia/hs-fs/hubfs/02-TMEIC_PE_32-selected.jpg?width=900&height=429&name=02-TMEIC_PE_32-selected.jpg)
![03-TMEIC_PE_06-selected](https://takenaka.asia/hs-fs/hubfs/03-TMEIC_PE_06-selected.jpg?width=900&height=583&name=03-TMEIC_PE_06-selected.jpg)
![04-TMEIC_PE_21-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-TMEIC_PE_21-selected.jpg?width=900&height=478&name=04-TMEIC_PE_21-selected.jpg)
India
TMEIC-PE INDIA Factory
Completion year | 2017 |
Client | TMEIC |
Location | BANGALORE,KARNATAKA |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Industrial |
Total Floor Area | 12,856m2 |
![02-IMEC_31-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-IMEC_31-selected.jpg?width=900&height=466&name=02-IMEC_31-selected.jpg)
![01-IMEC_01-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-IMEC_01-selected.jpg?width=900&height=367&name=01-IMEC_01-selected.jpg)
![03-IMEC_32-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-IMEC_32-selected.jpg?width=900&height=601&name=03-IMEC_32-selected.jpg)
![04-IMEC_10-selected](https://takenaka.asia/hs-fs/hubfs/04-IMEC_10-selected.jpg?width=900&height=579&name=04-IMEC_10-selected.jpg)
![05-IMEC_06-selected](https://takenaka.asia/hs-fs/hubfs/05-IMEC_06-selected.jpg?width=900&height=565&name=05-IMEC_06-selected.jpg)
![06-IMEC_24-selected](https://takenaka.asia/hs-fs/hubfs/06-IMEC_24-selected.jpg?width=900&height=600&name=06-IMEC_24-selected.jpg)
![07-IMEC_17-selected](https://takenaka.asia/hs-fs/hubfs/07-IMEC_17-selected.jpg?width=900&height=598&name=07-IMEC_17-selected.jpg)
![08-IMEC_19-selected](https://takenaka.asia/hs-fs/hubfs/08-IMEC_19-selected.jpg?width=900&height=494&name=08-IMEC_19-selected.jpg)
India
MITSUBISHI ELEVATOR New Factory
Completion year | 2016 |
Client | MITSUBISHI ELEVATOR |
Location | BANGALORE, KARNATAKA |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Industrial |
Total Floor Area | 25,214m2 |
![02_DAIKIN](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02_DAIKIN.jpg?width=900&height=511&name=02_DAIKIN.jpg)
![01-25_DAIKIN-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-25_DAIKIN-selected.jpg?width=900&height=470&name=01-25_DAIKIN-selected.jpg)
![02-24_DAIKIN-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-24_DAIKIN-selected.jpg?width=900&height=461&name=02-24_DAIKIN-selected.jpg)
![03-05_DAIKIN-selected](https://takenaka.asia/hs-fs/hubfs/03-05_DAIKIN-selected.jpg?width=900&height=677&name=03-05_DAIKIN-selected.jpg)
![04-12_DAIKIN-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-12_DAIKIN-selected.jpg?width=900&height=563&name=04-12_DAIKIN-selected.jpg)
India
DAIKIN R&D Center
Completion year | 2016 |
Client | DAIKIN |
Location | NEEMRANA, RAJASTHAN |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | R&D Center |
Total Floor Area | 5,136m2 |
![01-_SBS4357-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-_SBS4357-selected.jpg?width=900&height=594&name=01-_SBS4357-selected.jpg)
![02-_SBS4484-selected](https://takenaka.asia/hs-fs/hubfs/02-_SBS4484-selected.jpg?width=900&height=607&name=02-_SBS4484-selected.jpg)
![03-_SBS4534-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-_SBS4534-selected.jpg?width=900&height=592&name=03-_SBS4534-selected.jpg)
![04-_SBS4506-selected](https://takenaka.asia/hs-fs/hubfs/04-_SBS4506-selected.jpg?width=900&height=599&name=04-_SBS4506-selected.jpg)
![05-_SBS4808-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-_SBS4808-selected.jpg?width=900&height=585&name=05-_SBS4808-selected.jpg)
India
MUFG BANK NEW DELHI Branch Interior
Completion year | 2016 |
Client | MUFG |
Location | Delhi |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Interior |
Total Floor Area | 2,210.00 SQM |
![01-01_Takenaka_03_04_16_03-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-01_Takenaka_03_04_16_03-selected.jpg?width=900&height=544&name=01-01_Takenaka_03_04_16_03-selected.jpg)
![02-03_Takenaka_03_04_16_02_A-selected](https://takenaka.asia/hs-fs/hubfs/02-03_Takenaka_03_04_16_02_A-selected.jpg?width=900&height=441&name=02-03_Takenaka_03_04_16_02_A-selected.jpg)
![03-06_Takenaka_03_04_16_13_A-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-06_Takenaka_03_04_16_13_A-selected.jpg?width=900&height=483&name=03-06_Takenaka_03_04_16_13_A-selected.jpg)
![04-07_Takenaka_03_04_16_15_A-selected](https://takenaka.asia/hs-fs/hubfs/04-07_Takenaka_03_04_16_15_A-selected.jpg?width=900&height=558&name=04-07_Takenaka_03_04_16_15_A-selected.jpg)
![05-10_Takenaka_03_04_16_23_A-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-10_Takenaka_03_04_16_23_A-selected.jpg?width=900&height=571&name=05-10_Takenaka_03_04_16_23_A-selected.jpg)
![06-12_Takenaka_03_04_16_16_A-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06-12_Takenaka_03_04_16_16_A-selected.jpg?width=900&height=553&name=06-12_Takenaka_03_04_16_16_A-selected.jpg)
![07-23_Takenaka_03_04_16_28_A-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/07-23_Takenaka_03_04_16_28_A-selected.jpg?width=900&height=478&name=07-23_Takenaka_03_04_16_28_A-selected.jpg)
![08-27_Takenaka_03_04_16_33_A-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/08-27_Takenaka_03_04_16_33_A-selected.jpg?width=900&height=533&name=08-27_Takenaka_03_04_16_33_A-selected.jpg)
India
TMEIC RM New Factory
Completion year | 2016 |
Client | TMEIC |
Location | BANGALORE, KARNATAKA |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Industrial |
Total Floor Area | 1,5852m2 |
![EX03](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/EX03.jpg?width=900&height=586&name=EX03.jpg)
![01-EX01-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-EX01-selected.jpg?width=900&height=611&name=01-EX01-selected.jpg)
![02-EX02-selected](https://takenaka.asia/hs-fs/hubfs/02-EX02-selected.jpg?width=900&height=405&name=02-EX02-selected.jpg)
![03-IN01-selected](https://takenaka.asia/hs-fs/hubfs/03-IN01-selected.jpg?width=900&height=601&name=03-IN01-selected.jpg)
![04-IN03selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-IN03selected.jpg?width=900&height=600&name=04-IN03selected.jpg)
![05-IN04-selected](https://takenaka.asia/hs-fs/hubfs/05-IN04-selected.jpg?width=900&height=600&name=05-IN04-selected.jpg)
![06-IN07-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06-IN07-selected.jpg?width=900&height=436&name=06-IN07-selected.jpg)
![07-IN08-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/07-IN08-selected.jpg?width=900&height=459&name=07-IN08-selected.jpg)
India
IMAX INDIA NEW FACTORY
Completion year | 2015 |
Client | MITSUBISHI ALUMINIUM |
Location | MANDAL, GUJARAT |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Industrial |
Total Floor Area | 8,520m2 |
![143](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/143.jpg?width=900&height=600&name=143.jpg)
![01-141-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-141-selected.jpg?width=1000&height=498&name=01-141-selected.jpg)
![02-194-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-194-selected.jpg?width=1000&height=667&name=02-194-selected.jpg)
![03-01-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-01-selected.jpg?width=1000&height=667&name=03-01-selected.jpg)
![06-26-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06-26-selected.jpg?width=1000&height=667&name=06-26-selected.jpg)
![04-107-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-107-selected.jpg?width=1000&height=667&name=04-107-selected.jpg)
![05-119-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-119-selected.jpg?width=1000&height=666&name=05-119-selected.jpg)
![07-31-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/07-31-selected.jpg?width=1000&height=667&name=07-31-selected.jpg)
India
AJINOMOTO New Factory
Completion year | 2015 |
Client | AJINOMOTO |
Location | CHENNAI, TAMIL NADU |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Industrial |
Total Floor Area | 5,529.20 SQM |
![01-View_from_gate](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-View_from_gate.jpg?width=900&height=600&name=01-View_from_gate.jpg)
![01-02-Office_entrance-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-02-Office_entrance-selected.jpg?width=1000&height=667&name=01-02-Office_entrance-selected.jpg)
![02-08-Meeting_room4-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-08-Meeting_room4-selected.jpg?width=1000&height=667&name=02-08-Meeting_room4-selected.jpg)
![03-09-Canteen-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-09-Canteen-selected.jpg?width=1000&height=667&name=03-09-Canteen-selected.jpg)
![04-11-Production_area_1-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-11-Production_area_1-selected.jpg?width=1000&height=667&name=04-11-Production_area_1-selected.jpg)
India
MITSUI KINOKU COMPONENTS INDIA Factory (Phase 2)
Completion year | 2014 |
Client | MITSUI KINZOKU COMPONENTS |
Location | SANAND, GUJARAT |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Industrial |
Total Floor Area | 4,382.00 SQM |
![MI_ELEC-01_1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MI_ELEC-01_1.jpg?width=900&height=601&name=MI_ELEC-01_1.jpg)
![01-MI_ELEC-01_8-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-MI_ELEC-01_8-selected.jpg?width=1200&height=801&name=01-MI_ELEC-01_8-selected.jpg)
![02-MI_ELEC-01_7-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-MI_ELEC-01_7-selected.jpg?width=1200&height=801&name=02-MI_ELEC-01_7-selected.jpg)
![03-MI_ELEC-01_4-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-MI_ELEC-01_4-selected.jpg?width=1200&height=801&name=03-MI_ELEC-01_4-selected.jpg)
![04-MI_ELEC-01_10-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-MI_ELEC-01_10-selected.jpg?width=1200&height=801&name=04-MI_ELEC-01_10-selected.jpg)
![05-MI_ELEC-01_3-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-MI_ELEC-01_3-selected.jpg?width=1200&height=801&name=05-MI_ELEC-01_3-selected.jpg)
![06-MI_ELEC-01_11-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06-MI_ELEC-01_11-selected.jpg?width=1200&height=801&name=06-MI_ELEC-01_11-selected.jpg)
![07-MI_ELEC-01_5-selected](https://takenaka.asia/hs-fs/hubfs/07-MI_ELEC-01_5-selected.jpg?width=1200&height=801&name=07-MI_ELEC-01_5-selected.jpg)
India
MI ELECTRICAL STEEL PROCESSING INDIA Factory
Completion year | 2014 |
Client | MARUBINI ITOCHU ELECTRICAL STEEL PRECESSING |
Location | NEEMRANA, RAJASTHAN |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Industrial |
Total Floor Area | 9,337m2 |
![North_West_View](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/North_West_View.jpg?width=900&height=600&name=North_West_View.jpg)
![01-Aerial_View-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-Aerial_View-selected.jpg?width=1200&height=800&name=01-Aerial_View-selected.jpg)
![02-Entrance_Canopy-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-Entrance_Canopy-selected.jpg?width=1200&height=800&name=02-Entrance_Canopy-selected.jpg)
![03-OJI_15-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-OJI_15-selected.jpg?width=1200&height=614&name=03-OJI_15-selected.jpg)
![04-OJI_33-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-OJI_33-selected.jpg?width=1200&height=800&name=04-OJI_33-selected.jpg)
![05-OJI_42-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-OJI_42-selected.jpg?width=1200&height=800&name=05-OJI_42-selected.jpg)
![06-OJI_35-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06-OJI_35-selected.jpg?width=1200&height=800&name=06-OJI_35-selected.jpg)
![07-OJI_18-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/07-OJI_18-selected.jpg?width=1200&height=800&name=07-OJI_18-selected.jpg)
![08-OJI_16-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/08-OJI_16-selected.jpg?width=1200&height=609&name=08-OJI_16-selected.jpg)
India
OJI JK PACKAGING INDIA Factory
Completion year | 2014 |
Client | OJI INDIA PACKAGING |
Location | NEEMRANA, RAJASTHAN |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Industrial |
Total Floor Area | 15,342m2 |
![01-AMADA-01-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-AMADA-01-selected.jpg?width=1200&height=800&name=01-AMADA-01-selected.jpg)
![02-AMADA-02-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-AMADA-02-selected.jpg?width=1200&height=700&name=02-AMADA-02-selected.jpg)
![03-AMADA-08-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-AMADA-08-selected.jpg?width=1200&height=800&name=03-AMADA-08-selected.jpg)
![04-AMADA-06-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-AMADA-06-selected.jpg?width=1200&height=801&name=04-AMADA-06-selected.jpg)
![05-AMADA-07-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-AMADA-07-selected.jpg?width=1200&height=616&name=05-AMADA-07-selected.jpg)
![06-AMADA-05-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06-AMADA-05-selected.jpg?width=1200&height=800&name=06-AMADA-05-selected.jpg)
India
AMADA INDIA Technical Center
Completion year | 2014 |
Client | AMADA HOLDINGS |
Location | BANGALORE,KARNATAKA |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Industrial |
Total Floor Area | 6,250.00 SQM |
![01-TSTECH-18-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-TSTECH-18-selected.jpg?width=900&height=600&name=01-TSTECH-18-selected.jpg)
![02-TSTECH-48-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-TSTECH-48-selected.jpg?width=900&height=600&name=02-TSTECH-48-selected.jpg)
![03-TSTECH-45-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-TSTECH-45-selected.jpg?width=900&height=600&name=03-TSTECH-45-selected.jpg)
![04-TSTECH-29-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-TSTECH-29-selected.jpg?width=900&height=600&name=04-TSTECH-29-selected.jpg)
![05-TSTECH-25-selected](https://takenaka.asia/hs-fs/hubfs/05-TSTECH-25-selected.jpg?width=900&height=600&name=05-TSTECH-25-selected.jpg)
![06-TSTECH-28-selected](https://takenaka.asia/hs-fs/hubfs/06-TSTECH-28-selected.jpg?width=900&height=600&name=06-TSTECH-28-selected.jpg)
![07-TSTECH-21-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/07-TSTECH-21-selected.jpg?width=900&height=600&name=07-TSTECH-21-selected.jpg)
![08-TSTECH-30-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/08-TSTECH-30-selected.jpg?width=900&height=600&name=08-TSTECH-30-selected.jpg)
![09-TSTECH-38-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/09-TSTECH-38-selected.jpg?width=900&height=600&name=09-TSTECH-38-selected.jpg)
India
TS-TECH INDIA New Factory
Completion year | 2013 |
Client | TS-TECH INDIA PVT. LTD. |
Location | NEEMRANA, RAJASTHAN |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Industrial |
Total Floor Area | 18,089m2 |
![01-2-The-Building--West-Side-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-2-The-Building--West-Side-selected.jpg?width=900&height=600&name=01-2-The-Building--West-Side-selected.jpg)
![02-3-The-Building---North-West-Side-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-3-The-Building---North-West-Side-selected.jpg?width=900&height=600&name=02-3-The-Building---North-West-Side-selected.jpg)
![03-14-Office-Entrance-Lobby-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-14-Office-Entrance-Lobby-selected.jpg?width=900&height=600&name=03-14-Office-Entrance-Lobby-selected.jpg)
![04-17-Canteen-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-17-Canteen-selected.jpg?width=900&height=600&name=04-17-Canteen-selected.jpg)
India
AMAGASAKI PIPE INDIA Factory
Completion year | 2013 |
Client | AMAGASAKI PIPE |
Location | NEEMRANA, RAJASTHAN |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Industrial |
Total Floor Area | 6,915m2 |
![01-1-The-Building-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-1-The-Building-selected.jpg?width=900&height=600&name=01-1-The-Building-selected.jpg)
![02-12-Meeting-Room-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-12-Meeting-Room-selected.jpg?width=900&height=600&name=02-12-Meeting-Room-selected.jpg)
![03-11-Office-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-11-Office-selected.jpg?width=900&height=600&name=03-11-Office-selected.jpg)
![04-13-Canteen-selected](https://takenaka.asia/hs-fs/hubfs/04-13-Canteen-selected.jpg?width=900&height=600&name=04-13-Canteen-selected.jpg)
![05-6-Forging-Factory-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-6-Forging-Factory-selected.jpg?width=900&height=600&name=05-6-Forging-Factory-selected.jpg)
India
SANJO MACHINE WORKS INDIA Factory
Completion year | 2013 |
Client | SANJO MACHINE WORKS |
Location | NEEMRANA, RAJASTHAN |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Industrial |
Total Floor Area | 5,454m2 |
![02_Worms_Eye_View_from_N-E](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02_Worms_Eye_View_from_N-E.jpg?width=2000&name=02_Worms_Eye_View_from_N-E.jpg)
![01-19-Evening-View-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-19-Evening-View-selected.jpg?width=900&height=600&name=01-19-Evening-View-selected.jpg)
![02-04-Entrance-Canopy-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-04-Entrance-Canopy-selected.jpg?width=900&height=600&name=02-04-Entrance-Canopy-selected.jpg)
![04-09-Meeting-Room-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-09-Meeting-Room-selected.jpg?width=900&height=600&name=04-09-Meeting-Room-selected.jpg)
![05-10-Canteen-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-10-Canteen-selected.jpg?width=900&height=600&name=05-10-Canteen-selected.jpg)
![03-04-Entrance-Hall-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-04-Entrance-Hall-selected.jpg?width=900&height=600&name=03-04-Entrance-Hall-selected.jpg)
![06-14-Factory-Corridor-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06-14-Factory-Corridor-selected.jpg?width=900&height=600&name=06-14-Factory-Corridor-selected.jpg)
India
OILES CORPORATION INDIA Factory
Completion year | 2012 |
Client | OILES CORPORATION |
Location | NEEMRANA, RAJASTHAN |
Design | Takenaka India Pvt. Ltd. |
Construction | Takenaka India Pvt. Ltd. |
Building Type | Industrial |
Total Floor Area | 5,757m2 |
![DENSO-EXTERIOR-01](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DENSO-EXTERIOR-01.jpg?width=900&height=525&name=DENSO-EXTERIOR-01.jpg)
![01-DENSO-EXTERIOR-00-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-DENSO-EXTERIOR-00-selected.jpg?width=900&height=600&name=01-DENSO-EXTERIOR-00-selected.jpg)
![02-DENSO-EXTERIOR-02-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-DENSO-EXTERIOR-02-selected.jpg?width=900&height=600&name=02-DENSO-EXTERIOR-02-selected.jpg)
![03-DENSO-INTERIOR-01-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-DENSO-INTERIOR-01-selected.jpg?width=900&height=600&name=03-DENSO-INTERIOR-01-selected.jpg)
![04-IMG_71482-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-IMG_71482-selected.jpg?width=900&height=600&name=04-IMG_71482-selected.jpg)
![05-IMG_47052-selected](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-IMG_47052-selected.jpg?width=900&height=600&name=05-IMG_47052-selected.jpg)
India
DENSO Technical Center
Completion year | 2012 |
Client | DENSO INDIA PRIVATE LIMITED |
Location | MANESAR, HARYANA |
Design | Takenaka India Pvt. Ltd |
Construction | Takenaka India Pvt. Ltd |
Building Type | Industrial |
Total Floor Area | 6,982m2 |
![01-1.North_Aerial_View](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-1.North_Aerial_View.jpg?width=900&height=600&name=01-1.North_Aerial_View.jpg)
![02-10.North_Elevation](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-10.North_Elevation.jpg?width=900&height=600&name=02-10.North_Elevation.jpg)
![03-34.Entrance_Hall](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-34.Entrance_Hall.jpg?width=900&height=600&name=03-34.Entrance_Hall.jpg)
![04-62](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-62.jpg?width=900&height=600&name=04-62.jpg)
![05-23._Warehouse_Area_Zone_A](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-23._Warehouse_Area_Zone_A.jpg?width=900&height=600&name=05-23._Warehouse_Area_Zone_A.jpg)
Indonesia
MITSUI SOKO New Warehouse
Completion year | 2015 |
Client | PT. Mitsui Soko Indonesia |
Location | GIIC, Cikarang, West Java |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Warehouse |
Total Floor Area | 33,313.65 m2 |
![01-0813-PreviewOnly_MMKI_Project_Takenaka_-22.05.2017-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-0813-PreviewOnly_MMKI_Project_Takenaka_-22.05.2017-.jpg?width=900&height=600&name=01-0813-PreviewOnly_MMKI_Project_Takenaka_-22.05.2017-.jpg)
![02-062-MMKI_Project_Takenaka_-17.08.2016-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-062-MMKI_Project_Takenaka_-17.08.2016-.jpg?width=900&height=600&name=02-062-MMKI_Project_Takenaka_-17.08.2016-.jpg)
![03-213-MMKI_Project_Takenaka_-17.08.2016-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-213-MMKI_Project_Takenaka_-17.08.2016-.jpg?width=900&height=600&name=03-213-MMKI_Project_Takenaka_-17.08.2016-.jpg)
![04-123-MMKI_Project_Takenaka_-17.08.2016-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-123-MMKI_Project_Takenaka_-17.08.2016-.jpg?width=900&height=600&name=04-123-MMKI_Project_Takenaka_-17.08.2016-.jpg)
![05-486-PreviewOnly_MMKI_Project_Takenaka_-16.10.2016-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-486-PreviewOnly_MMKI_Project_Takenaka_-16.10.2016-.jpg?width=900&height=600&name=05-486-PreviewOnly_MMKI_Project_Takenaka_-16.10.2016-.jpg)
![06-498-PreviewOnly_MMKI_Project_Takenaka_-16.10.2016-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06-498-PreviewOnly_MMKI_Project_Takenaka_-16.10.2016-.jpg?width=900&height=600&name=06-498-PreviewOnly_MMKI_Project_Takenaka_-16.10.2016-.jpg)
![07-540-PreviewOnly_MMKI_Project_Takenaka_-16.10.2016-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/07-540-PreviewOnly_MMKI_Project_Takenaka_-16.10.2016-.jpg?width=900&height=600&name=07-540-PreviewOnly_MMKI_Project_Takenaka_-16.10.2016-.jpg)
![08-0834-PreviewOnly_MMKI_Project_Takenaka_-22.05.2017-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/08-0834-PreviewOnly_MMKI_Project_Takenaka_-22.05.2017-.jpg?width=900&height=600&name=08-0834-PreviewOnly_MMKI_Project_Takenaka_-22.05.2017-.jpg)
Indonesia
MMKI New Factory
Completion year | 2016 |
Client | PT. Mitsubishi Motors Krama Yudha Indonesia |
Location | GIIC, Cikarang, West Java |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Factory |
Total Floor Area | 177,981.24 m2 |
![1._Bird_s_Eye_View](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/1._Bird_s_Eye_View.jpg?width=900&height=600&name=1._Bird_s_Eye_View.jpg)
![4._Overview_from_Southeast](https://takenaka.asia/hs-fs/hubfs/4._Overview_from_Southeast.jpg?width=900&height=600&name=4._Overview_from_Southeast.jpg)
![8._Entrance_Car_Porch](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/8._Entrance_Car_Porch.jpg?width=900&height=600&name=8._Entrance_Car_Porch.jpg)
![9._Entrance_Hall](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/9._Entrance_Hall.jpg?width=900&height=600&name=9._Entrance_Hall.jpg)
![13._MLI_Office](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/13._MLI_Office.jpg?width=900&height=600&name=13._MLI_Office.jpg)
Indonesia
MLI New Warehouse
Completion year | 2017 |
Client | PT. Mitsubishi Logistics Indonesia |
Location | MM2100, Cibitung, West Java |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Warehouse |
Total Floor Area | 22,614.14 m2 |
![01-01_DJI_0004_copy](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-01_DJI_0004_copy.jpg?width=900&height=600&name=01-01_DJI_0004_copy.jpg)
![02-03_DSC09447_copy](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-03_DSC09447_copy.jpg?width=900&height=600&name=02-03_DSC09447_copy.jpg)
![03-10_DSC09678_copy](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-10_DSC09678_copy.jpg?width=900&height=600&name=03-10_DSC09678_copy.jpg)
![04-11_DSC09693_copy](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-11_DSC09693_copy.jpg?width=900&height=600&name=04-11_DSC09693_copy.jpg)
![05-25_DSC09703_copy](https://takenaka.asia/hs-fs/hubfs/05-25_DSC09703_copy.jpg?width=900&height=600&name=05-25_DSC09703_copy.jpg)
Indonesia
ECI New Factory
Completion year | 2018 |
Client | PT. Emina Cheese Indonesia |
Location | MM2100, Cibitung, West Java |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Factory |
Total Floor Area | 2,956m2 |
![01-01_____013___Untitled_Panorama2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-01_____013___Untitled_Panorama2.jpg?width=900&height=600&name=01-01_____013___Untitled_Panorama2.jpg)
![02-02_____012___IMG_4142](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-02_____012___IMG_4142.jpg?width=900&height=600&name=02-02_____012___IMG_4142.jpg)
![03-20_____030___IMG_4349](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-20_____030___IMG_4349.jpg?width=900&height=600&name=03-20_____030___IMG_4349.jpg)
![04-10_____074___IMG_4373](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-10_____074___IMG_4373.jpg?width=900&height=600&name=04-10_____074___IMG_4373.jpg)
![05-01_____085___IMG_3246](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-01_____085___IMG_3246.jpg?width=900&height=600&name=05-01_____085___IMG_3246.jpg)
![06-08_____126___IMG_3417_1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06-08_____126___IMG_3417_1.jpg?width=900&height=600&name=06-08_____126___IMG_3417_1.jpg)
![07-02_____099___IMG_3920](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/07-02_____099___IMG_3920.jpg?width=900&height=600&name=07-02_____099___IMG_3920.jpg)
![08-02_____129___IMG_3441](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/08-02_____129___IMG_3441.jpg?width=900&height=600&name=08-02_____129___IMG_3441.jpg)
![09-05_____063___IMG_4221](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/09-05_____063___IMG_4221.jpg?width=900&height=600&name=09-05_____063___IMG_4221.jpg)
![10-01_____143___IMG_4710](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/10-01_____143___IMG_4710.jpg?width=900&height=600&name=10-01_____143___IMG_4710.jpg)
Indonesia
Cikarang Hotel Residences Phase 2
Completion year | 2016 |
Client | PT. TTL Residence |
Location | Lippo Cikarang, West Java |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Serviced Apartments |
Total Floor Area | 28,647m2 |
![01-03-AR-CER-02](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-03-AR-CER-02.jpg?width=900&height=600&name=01-03-AR-CER-02.jpg)
![02-05-DSC08417AC](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-05-DSC08417AC.jpg?width=900&height=600&name=02-05-DSC08417AC.jpg)
![03-07-DSC02288AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-07-DSC02288AA.jpg?width=900&height=600&name=03-07-DSC02288AA.jpg)
![04-42._2F_Training_Room](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-42._2F_Training_Room.jpg?width=900&height=600&name=04-42._2F_Training_Room.jpg)
![05-41._2F_Canteen](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-41._2F_Canteen.jpg?width=900&height=600&name=05-41._2F_Canteen.jpg)
Indonesia
CERES GARUDA Factory
Completion year | 2016 |
Client | PT. Perusahan Industri Ceres |
Location | Bandung, West Java |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Factory |
Total Floor Area | 38,153m2 |
![01-216-BridgeStone_Office_TAKENAKA_-30.11_09.12.2017-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-216-BridgeStone_Office_TAKENAKA_-30.11_09.12.2017-.jpg?width=900&height=600&name=01-216-BridgeStone_Office_TAKENAKA_-30.11_09.12.2017-.jpg)
![02-510-BridgeStone_Office_TAKENAKA_-03.02.2018-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-510-BridgeStone_Office_TAKENAKA_-03.02.2018-.jpg?width=900&height=600&name=02-510-BridgeStone_Office_TAKENAKA_-03.02.2018-.jpg)
![03-407-BridgeStone_Office_TAKENAKA_-13.01.2017-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-407-BridgeStone_Office_TAKENAKA_-13.01.2017-.jpg?width=486&height=600&name=03-407-BridgeStone_Office_TAKENAKA_-13.01.2017-.jpg)
![05-483-BridgeStone_Office_TAKENAKA_-13.01.2017-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-483-BridgeStone_Office_TAKENAKA_-13.01.2017-.jpg?width=900&height=599&name=05-483-BridgeStone_Office_TAKENAKA_-13.01.2017-.jpg)
![356-BridgeStone_Office_TAKENAKA_-04-30.11_09.12.2017-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/356-BridgeStone_Office_TAKENAKA_-04-30.11_09.12.2017-.jpg?width=900&height=600&name=356-BridgeStone_Office_TAKENAKA_-04-30.11_09.12.2017-.jpg)
Indonesia
BSIN-K New Headquarters
Completion year | 2017 |
Client | PT. Bridgestone Tire Indonesia |
Location | Surya Cipta, Karawang, West Java |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Office |
Total Floor Area | 11,964m2 |
![Takenaka_0002_03-1325-AEON_MALL_JGC_-27.10.2017-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Takenaka_0002_03-1325-AEON_MALL_JGC_-27.10.2017-.jpg?width=900&height=600&name=Takenaka_0002_03-1325-AEON_MALL_JGC_-27.10.2017-.jpg)
![Takenaka_0000_05-1062-AEON_MALL_JGC_-27.10.2017-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Takenaka_0000_05-1062-AEON_MALL_JGC_-27.10.2017-.jpg?width=900&height=600&name=Takenaka_0000_05-1062-AEON_MALL_JGC_-27.10.2017-.jpg)
![Takenaka_0001_04-1180-AEON_MALL_JGC_-27.10.2017-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Takenaka_0001_04-1180-AEON_MALL_JGC_-27.10.2017-.jpg?width=900&height=600&name=Takenaka_0001_04-1180-AEON_MALL_JGC_-27.10.2017-.jpg)
![Takenaka_0003_02-1810-AEON_MALL_JGC_-24.01.2018-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Takenaka_0003_02-1810-AEON_MALL_JGC_-24.01.2018-.jpg?width=900&height=600&name=Takenaka_0003_02-1810-AEON_MALL_JGC_-24.01.2018-.jpg)
![Takenaka_0004_01-1547-AEON_MALL_JGC_-27.10.2017-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Takenaka_0004_01-1547-AEON_MALL_JGC_-27.10.2017-.jpg?width=900&height=600&name=Takenaka_0004_01-1547-AEON_MALL_JGC_-27.10.2017-.jpg)
Indonesia
AEON Mall JGC Project
Completion year | 2017 |
Client | PT. AEON Mall Indonesia |
Location | Indonesia |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Shopping Mall |
Total Floor Area | 159,846m2 |
![MUFJyangon-2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MUFJyangon-2.jpg?width=2000&height=1500&name=MUFJyangon-2.jpg)
![MUFJyangon-3](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MUFJyangon-3.jpg?width=2000&height=1500&name=MUFJyangon-3.jpg)
![MUFJyangon-4](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MUFJyangon-4.jpg?width=2000&name=MUFJyangon-4.jpg)
Myanmar
BTMU YANGON Branch
Completion year | 2015 |
Client | The Bank of Tokyo-Mitsubishi UFJ, Ltd. |
Location | Myanmar |
Design | Takenaka Corporation (Myanmar Branch) |
Construction | Takenaka Corporation (Myanmar Branch) |
Building Type | Office |
Total Floor Area | 898m2 |
![14_STF3Web](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/14_STF3Web.jpg?width=900&height=600&name=14_STF3Web.jpg)
Thailand
ST 3rd Factory
Completion year | 2014 |
Client | Undisclosed |
Location | Eastern Seaboard Ind. Est., Rayong |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Machinery Factory |
Total Floor Area | 3,910m2 |
![8c3ebbc3194df7e9011112a378267ca4](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/8c3ebbc3194df7e9011112a378267ca4.jpg?width=900&height=599&name=8c3ebbc3194df7e9011112a378267ca4.jpg)
![image](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/61803cd044e4b36eed3edf018f0c815c.jpg?width=900&height=599&name=61803cd044e4b36eed3edf018f0c815c.jpg)
Malaysia
KAYAKU SAFETY SYSTEMS Factory
Completion year | 2016 |
Client | Kayaku Safety Systems Malaysia Sdn. Bhd. |
Location | Seremban |
Design | Takenaka (M) Sdn. Bhd. |
Construction | Takenaka (M) Sdn. Bhd. |
Building Type | Factory |
Total Floor Area | 11,845m2 |
![DSC_9489](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC_9489.jpg?width=900&height=599&name=DSC_9489.jpg)
![DSC_9517](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC_9517.jpg?width=900&height=599&name=DSC_9517.jpg)
![DSC_9660](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC_9660.jpg?width=900&height=599&name=DSC_9660.jpg)
![DSC_9690](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC_9690.jpg?width=900&height=599&name=DSC_9690.jpg)
Malaysia
AEON BIG Ipoh Falim
Completion year | 2015 |
Client | Aeon Big (M) Sdn. Bhd. |
Location | Ipoh |
Design | Concept: Arkitek Rekawasan |
Construction | Takenaka (M) Sdn. Bhd. |
Building Type | Shopping Mall |
Total Floor Area | 90,780 m2 |
![ABC_8613](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/ABC_8613.jpg?width=900&height=599&name=ABC_8613.jpg)
![ABC_8682](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/ABC_8682.jpg?width=900&height=599&name=ABC_8682.jpg)
![ABC_8687](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/ABC_8687.jpg?width=900&height=599&name=ABC_8687.jpg)
![ABC_8696](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/ABC_8696.jpg?width=900&height=599&name=ABC_8696.jpg)
Malaysia
AEON BIG Alor Setar
Completion year | 2014 |
Client | Aeon Big (M) Sdn. Bhd. |
Location | Alor Setar |
Design | Concept: Johnny Ooi ArchitectDetail: Takenaka (M) Sdn. Bhd. |
Construction | Takenaka (M) Sdn. Bhd. |
Building Type | Shopping Mall |
Total Floor Area | 28,115 m2 |
![P_01](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/P_01.jpg?width=900&height=600&name=P_01.jpg)
![P_04](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/P_04.jpg?width=900&height=600&name=P_04.jpg)
![P_10](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/P_10.jpg?width=900&height=600&name=P_10.jpg)
![P_19](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/P_19.jpg?width=900&height=600&name=P_19.jpg)
Malaysia
PANASONIC ENERGY Factory
Completion year | 2012 |
Client | Panasonic Energy Malaysia Sdn. Bhd. |
Location | Kulim |
Design | Takenaka (M) Sdn. Bhd. |
Construction | Takenaka (M) Sdn. Bhd. |
Building Type | Factory |
Total Floor Area | 65,242m2 |
![DSC08788AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC08788AA.jpg?width=900&height=601&name=DSC08788AA.jpg)
![DSC09188AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC09188AA.jpg?width=900&height=601&name=DSC09188AA.jpg)
![DSC09525AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC09525AA.jpg?width=900&height=601&name=DSC09525AA.jpg)
![DSC09714_edit](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC09714_edit.jpg?width=900&height=601&name=DSC09714_edit.jpg)
![YKK-AP-003](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/YKK-AP-003.jpg?width=900&height=600&name=YKK-AP-003.jpg)
Indonesia
YKK ZIPCO DELTAMAS
Completion year | 2014 |
Client | PT. YKK Zipco Indonesia |
Location | GIIC, Cikarang |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Factory |
Total Floor Area | 26,328.55 m2 |
![0Bird_Eye_1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/0Bird_Eye_1.jpg?width=900&height=600&name=0Bird_Eye_1.jpg)
![1Ex-2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/1Ex-2.jpg?width=900&height=600&name=1Ex-2.jpg)
![1Ex-4](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/1Ex-4.jpg?width=900&height=600&name=1Ex-4.jpg)
![3PR-13](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/3PR-13.jpg?width=900&height=600&name=3PR-13.jpg)
![4P-5](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/4P-5.jpg?width=900&height=600&name=4P-5.jpg)
Indonesia
YAKULT INDONESIA
Completion year | 2013 |
Client | PT. Yakult Indonesia |
Location | NIP, Mojokerto, East Java |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Factory |
Total Floor Area | 22,451m2 |
![DSC00219AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC00219AA.jpg?width=900&height=600&name=DSC00219AA.jpg)
![DSC00224AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC00224AA.jpg?width=900&height=600&name=DSC00224AA.jpg)
![DSC00226AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC00226AA.jpg?width=900&height=600&name=DSC00226AA.jpg)
![DSC00334AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC00334AA.jpg?width=900&height=600&name=DSC00334AA.jpg)
![RP-09361AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/RP-09361AA.jpg?width=900&height=600&name=RP-09361AA.jpg)
Indonesia
ROCKPAINT
Completion year | 2013 |
Client | PT. Rockpaint Indonesia |
Location | KIIC, Karawang |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Factory |
Total Floor Area | 9,141.58 m2 |
![DSC09355AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC09355AA.jpg?width=900&height=600&name=DSC09355AA.jpg)
![DSC09357AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC09357AA.jpg?width=900&height=600&name=DSC09357AA.jpg)
![DSC09375AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC09375AA.jpg?width=900&height=600&name=DSC09375AA.jpg)
![DSC09477AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC09477AA.jpg?width=900&height=600&name=DSC09477AA.jpg)
![Photo_View_3_copy](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Photo_View_3_copy.jpg?width=900&height=600&name=Photo_View_3_copy.jpg)
Indonesia
LOTTE
Completion year | 2014 |
Client | PT. Lotte Indonesia |
Location | MM 2100, Cibitung |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Factory |
Total Floor Area | 12,241.75 m2 |
![DSC00162AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC00162AA.jpg?width=900&height=600&name=DSC00162AA.jpg)
![DSC04795AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC04795AA.jpg?width=900&height=600&name=DSC04795AA.jpg)
![DSC04931AA-copy](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC04931AA-copy.jpg?width=900&height=600&name=DSC04931AA-copy.jpg)
![2013.11.19re](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/2013.11.19re.jpg?width=900&height=600&name=2013.11.19re.jpg)
![DSC05211AA-copy](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC05211AA-copy.jpg?width=900&height=600&name=DSC05211AA-copy.jpg)
Indonesia
HPM
Completion year | 2003, 2013 |
Client | PT. Honda Prospect Motor |
Location | KIM, Karawang |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Factory |
Total Floor Area | 247,362m2 |
![08240009](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/08240009.jpg?width=900&height=600&name=08240009.jpg)
![11130006](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/11130006.jpg?width=900&height=600&name=11130006.jpg)
![25190006](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/25190006.jpg?width=900&height=600&name=25190006.jpg)
![25190001](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/25190001.jpg?width=900&height=600&name=25190001.jpg)
![25290002](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/25290002.jpg?width=900&height=600&name=25290002.jpg)
Indonesia
HANWA (HSSI)
Completion year | 2009, 2011, 2012 |
Client | PT. Hanwa Steel Service Indonesia |
Location | MM 2100, Cibitung |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Factory |
Total Floor Area | 17,434m2 |
![27_____020___IMG_3698](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/27_____020___IMG_3698.jpg?width=900&height=600&name=27_____020___IMG_3698.jpg)
![124-TTL_Residences_TAKENAKA_-22_23_25.09.2014-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/124-TTL_Residences_TAKENAKA_-22_23_25.09.2014-.jpg?width=900&height=600&name=124-TTL_Residences_TAKENAKA_-22_23_25.09.2014-.jpg)
![268-TTL_Residences_TAKENAKA_-22_23_25.09.2014-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/268-TTL_Residences_TAKENAKA_-22_23_25.09.2014-.jpg?width=900&height=600&name=268-TTL_Residences_TAKENAKA_-22_23_25.09.2014-.jpg)
![474-TTL_Residences_TAKENAKA_-22_23_25.09.2014-](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/474-TTL_Residences_TAKENAKA_-22_23_25.09.2014-.jpg?width=900&height=600&name=474-TTL_Residences_TAKENAKA_-22_23_25.09.2014-.jpg)
Indonesia
Cikarang Hotel Residences
Completion year | 2014 |
Client | PT. Toyota Tsusho Indonesia |
Location | Lippo, Cikarang |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Serviced Apartments |
Total Floor Area | 28,647m2 |
![11890002](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/11890002.jpg?width=900&height=603&name=11890002.jpg)
![34370001](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/34370001.jpg?width=900&height=603&name=34370001.jpg)
![34370006A](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/34370006A.jpg?width=900&height=603&name=34370006A.jpg)
![2-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/2-1.jpg?width=900&height=603&name=2-1.jpg)
![4-2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/4-2.jpg?width=900&height=603&name=4-2.jpg)
Indonesia
KUMON INSTITUTE OF EDUCATION (INDONESIA) Office
Completion year | 2010 |
Client | PT. KIE Indonesia |
Location | Jakarta |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Office |
Total Floor Area | 3,557m2 |
![FA-13](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/FA-13.jpg?width=900&height=600&name=FA-13.jpg)
![FA-28](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/FA-28.jpg?width=900&height=600&name=FA-28.jpg)
![FA-30](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/FA-30.jpg?width=900&height=600&name=FA-30.jpg)
![FA-37](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/FA-37.jpg?width=900&height=600&name=FA-37.jpg)
![FA-43](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/FA-43.jpg?width=900&height=600&name=FA-43.jpg)
Indonesia
FREY ABADI INDOTAMA Factory
Completion year | 2011, 2012, 2013 |
Client | PT. Freyabadi Indotama |
Location | KIIC, Karawang |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Factory |
Total Floor Area | 14,098.93 m2 |
![DSC01045AA](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC01045AA.jpg?width=900&height=600&name=DSC01045AA.jpg)
![DSC08555__EDIT](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC08555__EDIT.jpg?width=900&height=600&name=DSC08555__EDIT.jpg)
![Jitek-03](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Jitek-03.jpg?width=2000&name=Jitek-03.jpg)
![Jitek-21](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Jitek-21.jpg?width=900&height=600&name=Jitek-21.jpg)
![Jitek-13A](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Jitek-13A.jpg?width=900&height=600&name=Jitek-13A.jpg)
Indonesia
JID Factory
Completion year | 2011, 2012, 2013 |
Client | PT. JTEKT Indonesia |
Location | Surya Cipta, Karawang |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Factory |
Total Floor Area | 48,153m2 |
![DSC05265AB](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC05265AB.jpg?width=900&height=600&name=DSC05265AB.jpg)
![DSC05305AB](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC05305AB.jpg?width=900&height=600&name=DSC05305AB.jpg)
![DSC05297AB](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC05297AB.jpg?width=900&height=600&name=DSC05297AB.jpg)
![DSC06225](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DSC06225.jpg?width=900&height=600&name=DSC06225.jpg)
![SANKO_G_add-03](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/SANKO_G_add-03.jpg?width=900&height=600&name=SANKO_G_add-03.jpg)
Indonesia
SANKO GOSEI TECHNOLOGY Indonesia Factory
Completion year | 2012, 2013 |
Client | PT. Sanko Gosei Technology Indonesia |
Location | Surya Cipta, Karawang |
Design | PT. Takenaka Indonesia |
Construction | PT. Takenaka Indonesia |
Building Type | Factory |
Total Floor Area | 12,519m2 |
![08-IMG_1248](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/08-IMG_1248.jpg?width=900&height=600&name=08-IMG_1248.jpg)
![12_N7X0384](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/12_N7X0384.jpg?width=900&height=600&name=12_N7X0384.jpg)
![140310_084700](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/140310_084700.jpg?width=900&height=600&name=140310_084700.jpg)
Singapore
YAMAZAKI MAZAK Factory Extension
Completion year | 2013 |
Client | Yamazaki Mazak Singapore Pte Ltd |
Location | Joo Koon, Singapore |
Design | Takenaka Corporation Singapore Office |
Construction | Takenaka Corporation Singapore Office |
Building Type | Factory |
Total Floor Area | 22,400m2 |
![8._Supreme_Court_Facade2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/8._Supreme_Court_Facade2.jpg?width=900&height=600&name=8._Supreme_Court_Facade2.jpg)
![7._City_Hall_Historical_Stair_Case](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/7._City_Hall_Historical_Stair_Case.jpg?width=900&height=600&name=7._City_Hall_Historical_Stair_Case.jpg)
![18._Rotunda](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/18._Rotunda.jpg?width=900&height=600&name=18._Rotunda.jpg)
![26._Atrium](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/26._Atrium.jpg?width=900&height=600&name=26._Atrium.jpg)
![10._City_Hall_Chamber_1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/10._City_Hall_Chamber_1.jpg?width=900&height=600&name=10._City_Hall_Chamber_1.jpg)
![CMN-998-111-2081](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/CMN-998-111-2081.jpg?width=900&height=600&name=CMN-998-111-2081.jpg)
![Credit_National_Gallery_Singapore](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/Credit_National_Gallery_Singapore.jpg?width=600&height=902&name=Credit_National_Gallery_Singapore.jpg)
![CMN-998-190-2121](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/CMN-998-190-2121.jpg?width=900&height=600&name=CMN-998-190-2121.jpg)
![CMN-998-162-2024](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/CMN-998-162-2024.jpg?width=900&height=600&name=CMN-998-162-2024.jpg)
![CMN-998-139-2053](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/CMN-998-139-2053.jpg?width=600&height=900&name=CMN-998-139-2053.jpg)
Singapore
NATIONAL GALLERY SINGAPORE
Completion year | 2015 |
Client | National Gallery Singapore |
Location | St Andrew’s Road, Singapore |
Design | Studio Milou Architects / CPG Consultants Pte. Ltd. |
Construction | Takenaka Corporation Singapore Office |
Building Type | Art Gallery |
Total Floor Area | 62,600m2 |
![VC8H0041A](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/VC8H0041A.jpg?width=900&height=393&name=VC8H0041A.jpg)
![VC8H0010A](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/VC8H0010A.jpg?width=900&height=600&name=VC8H0010A.jpg)
![05A](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05A.jpg?width=900&height=600&name=05A.jpg)
![VC8H0022A](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/VC8H0022A.jpg?width=900&height=600&name=VC8H0022A.jpg)
Singapore
LASALLE College of the Arts
Completion year | 2007 |
Client | LASALLE Foundation Limited |
Location | McNally Street, Singapore |
Design | RSP Architects Planners & Engineers (Pte) Ltd |
Construction | Takenaka Corporation Singapore Office |
Building Type | Arts College |
Total Floor Area | 35,000m2 |
![MORI0001_copy](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MORI0001_copy.jpg?width=900&height=600&name=MORI0001_copy.jpg)
![02-MORI0248_copy2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-MORI0248_copy2.jpg?height=2000&name=02-MORI0248_copy2.jpg)
![cc](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/cc.jpg?width=900&height=600&name=cc.jpg)
Singapore
Office Annex Building
Completion year | 2012 |
Client | Undisclosed |
Location | North Canal Road, Singapore |
Design | WOHA Architects Pte Ltd |
Construction | Takenaka Corporation Singapore Office |
Building Type | Office |
Total Floor Area | 1,400m2 |
![MNK3982_edited_1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MNK3982_edited_1.jpg?width=900&height=598&name=MNK3982_edited_1.jpg)
![MLD0130](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MLD0130.jpg?width=900&height=599&name=MLD0130.jpg)
![MLD0165](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MLD0165.jpg?width=900&height=596&name=MLD0165.jpg)
![MLD0177](https://takenaka.asia/hs-fs/hubfs/MLD0177.jpg?width=900&height=599&name=MLD0177.jpg)
![MLD0153](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MLD0153.jpg?width=900&height=599&name=MLD0153.jpg)
Singapore
HEWLETT PACKARD Ink Factory
Completion year | 2014 |
Client | Hewlett-Packard Singapore (Pte) Ltd |
Location | Tuas, Singapore |
Design | 3HPArchitects Pte. Ltd. / Takenaka Corporation Singapore Office |
Construction | Takenaka Corporation Singapore Office |
Building Type | Factory |
Total Floor Area | 20,000m2 |
![VC8H0021a_1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/VC8H0021a_1.jpg?width=900&height=600&name=VC8H0021a_1.jpg)
Singapore
CHANGI INTERNATIONAL AIRPORT Terminal 2 Upgrading
Completion year | 2006 |
Client | Civil Aviation Authority of Singapore |
Location | Changi, Singapore |
Design | RSP Architects Planners & Engineers (Pte) Ltd |
Construction | Takenaka Corporation Singapore Office |
Building Type | Airport |
Total Floor Area | 124,900m2 |
![MORI0173_A](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MORI0173_A.jpg?width=900&height=600&name=MORI0173_A.jpg)
![CC](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/CC.jpg?width=900&height=597&name=CC.jpg)
![MORI0064](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MORI0064.jpg?width=900&height=600&name=MORI0064.jpg)
![MORI0105-HDR-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MORI0105-HDR-1.jpg?width=900&height=600&name=MORI0105-HDR-1.jpg)
![MORI0022_copy-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/MORI0022_copy-1.jpg?width=900&height=600&name=MORI0022_copy-1.jpg)
Singapore
CHANGI INTERNATIONAL AIRPORT Terminal 1 Upgrading
Completion year | 2011 |
Client | Changi Airport Group (Singapore) Pte Ltd |
Location | Changi, Singapore |
Design | Woodhead Pte Ltd / Architects 61 Pte Ltd |
Construction | Takenaka Corporation Singapore Office |
Building Type | Airport |
Total Floor Area | 184,800m2 |
![B_N7X0330](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/B_N7X0330.jpg?width=900&height=600&name=B_N7X0330.jpg)
![B_N7X0347](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/B_N7X0347.jpg?width=900&height=600&name=B_N7X0347.jpg)
![DI_N7X9200-9201-9202](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DI_N7X9200-9201-9202.jpg?width=900&height=344&name=DI_N7X9200-9201-9202.jpg)
![ll](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/ll.jpg?width=900&height=600&name=ll.jpg)
![DI_N7X9226](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/DI_N7X9226.jpg?width=900&height=600&name=DI_N7X9226.jpg)
Singapore
BECTON DICKINSON Annex Office
Completion year | 2013 |
Client | Becton Dickinson Medical (S) Pte Ltd |
Location | Tuas, Singapore |
Design | Takenaka Corporation Singapore Office |
Construction | Takenaka Corporation Singapore Office |
Building Type | Office |
Total Floor Area | 2,200m2 |
![33_TYE-S-5-min](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/33_TYE-S-5-min.png?width=900&height=601&name=33_TYE-S-5-min.png)
Thailand
TYE-S New Plant
Completion year | 2015 |
Client | Thai-Yazaki Electric Wire Co.,Ltd. |
Location | Asia ind. Suvarnabhumi |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 20,144m2 |
![IMG_3985](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IMG_3985.jpg?width=2000&name=IMG_3985.jpg)
![IMG_4060](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IMG_4060.jpg?width=2000&name=IMG_4060.jpg)
![IMG_4108](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IMG_4108.jpg?width=2000&name=IMG_4108.jpg)
![IMG_5022](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IMG_5022.jpg?width=2000&name=IMG_5022.jpg)
![IMG_40112](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IMG_40112.jpg?width=2000&name=IMG_40112.jpg)
Thailand
TOYOTA BUZZ RAMA2
Completion year | 2016 |
Client | Toyota BUZZ Co.,Ltd. |
Location | Rama 2, Bangkok |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Automobile Showroom |
Total Floor Area | 21,150m2 |
![IMG_6389_re](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IMG_6389_re.jpg?width=1000&height=667&name=IMG_6389_re.jpg)
![IMG_8459](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IMG_8459.jpg?width=2000&name=IMG_8459.jpg)
![IMG_8513](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IMG_8513.jpg?width=2000&name=IMG_8513.jpg)
![IMG_8525](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IMG_8525.jpg?width=2000&name=IMG_8525.jpg)
![IMG_8618](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/IMG_8618.jpg?width=2000&name=IMG_8618.jpg)
Thailand
TOYOTA BUZZ CHAINAT
Completion year | 2015 |
Client | Toyota Chainat 2015 Co.,Ltd. |
Location | Chainat |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Automobile Showroom |
Total Floor Area | 11,469m2 |
![28_AM-FACTORY-PH-1-4-min](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/28_AM-FACTORY-PH-1-4-min.png?width=900&height=601&name=28_AM-FACTORY-PH-1-4-min.png)
Thailand
A&M Factory Phase 1
Completion year | 2015 |
Client | A&M Casting (Thailand) Co.,Ltd. |
Location | Ratchaburi I.E. |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 6,069m2 |
![27_IIDA-ELECTRONICS-8-min](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/27_IIDA-ELECTRONICS-8-min.png?width=900&height=601&name=27_IIDA-ELECTRONICS-8-min.png)
Thailand
IIDA ELECTRONICS New Factory
Completion year | 2015 |
Client | IIDA Electronics (Thailand) Co.,Ltd. |
Location | Asia ind. Suvarnabhumi |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 10,620 m2 |
![26_TTTC-OFF-1-min](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/26_TTTC-OFF-1-min.png?width=900&height=601&name=26_TTTC-OFF-1-min.png)
Thailand
TTTC EASTERN SEABOARD BRANCH (Office)
Completion year | 2014 |
Client | Toyota Tsusho (Thailand) Co., Ltd. |
Location | Heamaraj Eastern Seaboard Ind. Est., Rayong |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Office Interior |
Total Floor Area | 2,419 m2 |
![24_TBKK-2-min](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/24_TBKK-2-min.png?width=900&height=601&name=24_TBKK-2-min.png)
Thailand
TBKK Factory
Completion year | 2015 |
Client | TBKK (Thailand) Co.,Ltd. |
Location | Amata Nakorn IE, Chonburi. |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 38,932m2 |
![21_KJT-BANPHO-F1-2-min](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/21_KJT-BANPHO-F1-2-min.png?width=900&height=601&name=21_KJT-BANPHO-F1-2-min.png)
Thailand
KJT BANPHO Factory 1
Completion year | 2013 |
Client | Koyo Joint (Thailand) Co.,Ltd. |
Location | BP Ind.Park |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 5,930m2 |
![19_SUZUYO-BANGPEE-PH-1-2-min](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/19_SUZUYO-BANGPEE-PH-1-2-min.png?width=900&height=601&name=19_SUZUYO-BANGPEE-PH-1-2-min.png)
Thailand
SUZUYO BANGPLEE Warehouse Phase 1
Completion year | 2015 |
Client | Suzuyo Distribution Center (Thailand) Ltd. |
Location | Bangplee, Samut Prakarn. |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Warehouse |
Total Floor Area | 37,020 m2 |
![18_SPARKTEC-Th-FACTORY-min](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/18_SPARKTEC-Th-FACTORY-min.png?width=900&height=601&name=18_SPARKTEC-Th-FACTORY-min.png)
Thailand
SPARKTEC-TH Factory
Completion year | 2013 |
Client | SparkTec (Thailand) Co.,Ltd. |
Location | Amata Nakorn Ind.Est. |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 17,967 m2 |
![17_JTEKT-GATEWAY-NEW-FACTORY-min](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/17_JTEKT-GATEWAY-NEW-FACTORY-min.png?width=900&height=601&name=17_JTEKT-GATEWAY-NEW-FACTORY-min.png)
Thailand
JTEKT (THAILAND) CO., LTD. Gateway Plant
Completion year | 2013 |
Client | JTEKT (Thailand) Co.,Ltd. |
Location | Gateway Ind., Est.,Chachoengsao |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 15,409 m2 |
![01](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01.jpg?width=2000&name=01.jpg)
![02](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02.jpg?width=2000&name=02.jpg)
![03](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03.jpg?height=2000&name=03.jpg)
![04](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04.jpg?width=2000&name=04.jpg)
![05](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05.jpg?width=2000&name=05.jpg)
Thailand
ALINCO (THAILAND) New Factory
Completion year | 2014 |
Client | Alinco (Thailand) Co.,Ltd. |
Location | Sinsakhon Ind. Est., Samut Sakhon |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 9,834m2 |
![13_MEGA-TNC-2-min](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/13_MEGA-TNC-2-min.png?width=900&height=601&name=13_MEGA-TNC-2-min.png)
Thailand
MEGA TNC (RSP Plant)
Completion year | 2013 |
Client | Thai NOK Co.,Ltd. |
Location | Amata Nakorn Ind.Est. |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 22,060m2 |
![07_MAJEND-Kyoraku-min](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/07_MAJEND-Kyoraku-min.png?width=900&height=601&name=07_MAJEND-Kyoraku-min.png)
![07_MAJEND-Kyoraku-min-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/07_MAJEND-Kyoraku-min-1.png?width=900&height=601&name=07_MAJEND-Kyoraku-min-1.png)
Thailand
MAJEND MAKCS Factory
Completion year | 2012 |
Client | Majend Makcs (Thailand) Co.,Ltd. |
Location | Amata City Ind.Est., Rayong |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 10,693m2 |
![06_TOYOTOMI-KIKO-1-min](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06_TOYOTOMI-KIKO-1-min.png?width=900&height=601&name=06_TOYOTOMI-KIKO-1-min.png)
![06_TOYOTOMI-KIKO-1-min-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/06_TOYOTOMI-KIKO-1-min-1.png?width=900&height=601&name=06_TOYOTOMI-KIKO-1-min-1.png)
Thailand
TOYOTOMI KIKO New Factory
Completion year | 2013 |
Client | Toyotomi Auto Parts (Thailand) Co.,Ltd. |
Location | TFD Ind. Est., Chachoengsao |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 37,287m2 |
![AISIN_AI_F3_05](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/AISIN_AI_F3_05.jpg?width=900&height=600&name=AISIN_AI_F3_05.jpg)
![AISIN_AI_F3_04](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/AISIN_AI_F3_04.jpg?width=900&height=600&name=AISIN_AI_F3_04.jpg)
![AISIN_AI_F3_03](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/AISIN_AI_F3_03.jpg?width=900&height=600&name=AISIN_AI_F3_03.jpg)
![AISIN_AI_F3_02](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/AISIN_AI_F3_02.jpg?width=904&height=600&name=AISIN_AI_F3_02.jpg)
Thailand
AISIN AI Factory 3
Completion year | 2012 |
Client | Aisin AI (Thailand) Co.,Ltd. |
Location | Wellgrow Ind. Est., Chachoengsao |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 15,358 m2 |
![01-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01-1.jpg?width=2000&name=01-1.jpg)
![02-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-1.jpg?width=2000&name=02-1.jpg)
![03-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-1.jpg?width=2000&name=03-1.jpg)
![04-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/04-1.jpg?width=2000&name=04-1.jpg)
![05-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-1.jpg?width=2000&name=05-1.jpg)
Thailand
KOKUYO-IK Factory 2
Completion year | 2012 |
Client | Kokuyo-IK (Thailand) Co.,Ltd. |
Location | Bangpoo Ind. Est., Samut Prakarn |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 4,784m2 |
![META_F4-04](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/META_F4-04.jpg?width=1024&height=683&name=META_F4-04.jpg)
![05-2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/05-2.jpg?width=1024&height=683&name=05-2.jpg)
![03-2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03-2.jpg?width=1024&height=683&name=03-2.jpg)
![02-2](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/02-2.jpg?width=1024&height=683&name=02-2.jpg)
![takenaka-mitsubishi-electric-thailand](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/takenaka-mitsubishi-electric-thailand.png?width=900&height=601&name=takenaka-mitsubishi-electric-thailand.png)
Thailand
META Factory 4
Completion year | 2012 |
Client | MITSUBISHI ELECTRIC THAI AUTO-PART CO., LTD. |
Location | Siam Eastern Ind.Park |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 24,672m2 |
![03_HMST-HO-RENOV-min](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03_HMST-HO-RENOV-min.png?width=900&height=601&name=03_HMST-HO-RENOV-min.png)
![03_HMST-HO-RENOV-min-1](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/03_HMST-HO-RENOV-min-1.png?width=900&height=601&name=03_HMST-HO-RENOV-min-1.png)
Thailand
HMST HEAD Office Renovation
Completion year | 2011 |
Client | Hino Motors Sales (Thailand) Ltd. |
Location | Vibhavadi-Rangsit Rd, Bangkok |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Office Interior |
Total Floor Area | 1,087 m2 |
![01_FUSERASHI-min](https://takenaka.asia/hs-fs/hubfs/01_FUSERASHI-min.png?width=900&height=601&name=01_FUSERASHI-min.png)
![01_FUSERASHI-min](https://takenaka.asia/hs-fs/hubfs/Projects%20in%20Asia/Images/01_FUSERASHI-min.png?width=900&height=601&name=01_FUSERASHI-min.png)
Thailand
FUSERASHI (THAILAND) Factory Phase 2
Completion year | 2011 |
Client | Fuserashi (Thailand) Co.,Ltd. |
Location | Rayong |
Design | Thai Takenaka International Ltd. |
Construction | Thai Takenaka International Ltd. |
Building Type | Factory |
Total Floor Area | 3,143m2 |